OSHA SearchOSHA records by employer

416 Johnson Properties, Ltd.: OSHA inspections and violations

Bridgeport, Pennsylvania · Computer Facilities Management Services · NAICS 541513

2inspections
7citation items
$6,088current penalties
Jan 12, 2017last inspection

Since 2010, OSHA inspectors have visited 416 Johnson Properties, Ltd. in Pennsylvania 2 times.

The most recent inspection opened on Jan 12, 2017 as part of a related case, in Bridgeport.

In all, OSHA issued 7 citation items: 6 serious and 1 other-than-serious.

The proposed penalties came to $8,544; today they stand at $6,088, 29% less.

The rule cited most here is 1910.219 (belts, pulleys and power-transmission parts), 2 times.

Among professional services employers, the typical cited inspection since 2015 ends with a $1,822 penalty. 416 Johnson Properties, Ltd. averages $4,700 across 1 cited inspection.

416 Johnson Properties, Ltd. also files yearly injury logs with OSHA, summarized below.

416 Johnson Properties, Ltd.: OSHA citation items per year, 2010 to 2017
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

285employers cited

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch 416 Johnson Properties, Ltd. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342183894 OPENED JAN 12, 2017Closed

Unprogrammed related · Partial · Safety · 13 employees at the site · Closed Apr 21, 2017

416 Depot St., Bridgeport, PA 19405 · Computer Facilities Management Services · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$3,622$2,712Mar 28, 2017Final
Citation 1, item 2a
29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts
Serious$2,897$1,988Mar 28, 2017Final
Citation 1, item 2b
29 CFR 1910.219(e)(4) · Belts, pulleys and power-transmission parts
Serious$0$0Mar 28, 2017Final

Inspection 312979495 OPENED MAR 4, 2010Closed

Unprogrammed other · Partial · Safety · 6 employees at the site · Closed May 13, 2010

416 Depot St., Bridgeport, PA 19405 · Computer Facilities Management Services · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.101(b) · Compressed gases (general requirements)
Serious$525$263Mar 30, 2010Closed
Citation 1, item 2
29 CFR 1910.147(d)(2) · Lockout/tagout
Other-than-serious$750$750Mar 30, 2010Closed
Citation 1, item 3
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$375$188Mar 30, 2010Closed
Citation 1, item 4
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$375$187Mar 30, 2010Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2024, the Bridgeport site logged 0 recordable injuries or illnesses among about 13 workers: 0.0 per 100 full-time workers, against a median of 3.6 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
416 Johnson Properties
Bridgeport · 2024
13 000.03.6

Included with any plan: 6 more yearly logs from these sites, back to 2018, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.101 · Compressed gases (general requirements)

29 CFR 1910.101(b)

(b) Compressed gases. The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks shall be in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in § 1910.6.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(d)(2)

(2) Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage.

29 CFR 1910.212 · Machine guarding

29 CFR 1910.212(a)(1)

(a) Machine guarding—(1) Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. Examples of guarding methods are—barrier guards, two-hand tripping devices, electronic safety devices, etc.

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

Other computer facilities management services employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.