AA Stucco & Drywall, Inc.: OSHA inspections and violations
Naples, Florida · Drywall and Insulation Contractors · NAICS 238310
7inspections
9citation items
$4,295current penalties
Jul 17, 2018last inspection
OSHA has inspected AA Stucco & Drywall, Inc. 7 times in Florida since 1990.
The latest one began on Jul 17, 2018 as a planned inspection, in Naples.
Those inspections ended with 9 citation items: 5 serious and 4 other-than-serious.
Penalties were first proposed at $6,911 and now stand at $4,295, 38% lower after settlements or reviews.
Fall protection systems comes up most often in these citations: 3 items under 1926.502.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and AA Stucco & Drywall, Inc. averages $2,218 (1 cited inspection).
AA Stucco & Drywall, Inc. also files yearly injury logs with OSHA, summarized below.
It reported 1 severe injury to OSHA since 2015.
Citation items per year, by inspection date.
Florida · latest 90 days of OSHA records
320employers cited
4 of them in the same industry
Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2024, the Naples site logged 0 recordable injuries or illnesses among about 69 workers: 0.0 per 100 full-time workers, against a median of 2.8 for its industry.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
AA Stucco & Drywall, Inc.
Naples · 2024
69
0
0
0.0
2.8
Included with any plan: 8 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(2) Temporary wiring—(i) Scope. The provisions of paragraph (a)(2) of this section apply to temporary electrical power and lighting wiring methods which may be of a class less than would be required for a permanent installation. Except as specifically modified in paragraph (a)(2) of this section, all other requirements of this subpart for permanent wiring shall apply to temporary wiring installations. Temporary wiring shall be removed immediately upon completion of construction or the purpose for which the wiring was installed.
(a) Capacity. (1) Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.
29 CFR 1926.500 · Scope, application, and definitions applicable to this subpart
Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.