Inspection 344565312 OPENED JAN 17, 2020Closed
3087 Ocean Avenue, Brooklyn, NY 11235 · Framing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
OSHA has inspected AD Complete Construction Inc. 2 times in New York since 2019.
The latest one began on Jan 17, 2020 to follow up on an earlier case, in Brooklyn.
Those inspections ended with 3 citation items: 3 serious.
Penalties were first proposed at $8,526 and now stand at $3,000, 65% lower after settlements or reviews.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and AD Complete Construction Inc. averages $3,000 (1 cited inspection).
New York · latest 90 days of OSHA records
350employers cited
13 of them in the same industry
Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in New York
Checking a subcontractor, a client or your own company? Watch AD Complete Construction Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company3087 Ocean Avenue, Brooklyn, NY 11235 · Framing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
3087 Ocean Ave., Brooklyn, NY 11235 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites |
Serious | $2,842 | $1,500 | Nov 13, 2019 | Final |
| Citation 1, item 4a 29 CFR 1926.405(g)(2)(iii) · Job-site wiring |
Serious | $2,842 | $1,500 | Nov 13, 2019 | Final |
| Citation 1, item 4b 29 CFR 1926.416(e)(1) · Electrical safety in construction |
Serious | $2,842 | $0 | Nov 13, 2019 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.404(b)(1)(i)
(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.
29 CFR 1926.405(g)(2)(iii)
(iii) Splices. Flexible cords shall be used only in continuous lengths without splice or tap. Hard service flexible cords No. 12 or larger may be repaired if spliced so that the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced.
29 CFR 1926.416(e)(1)
(e) Cords and cables. (1) Worn or frayed electric cords or cables shall not be used.
Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.