OSHA SearchOSHA records by employer

Advanced Building Services, LLC: OSHA inspections and violations

Pecos, Texas · Support Activities for Oil and Gas Operations · NAICS 213112

8inspections
11citation items
$29,964current penalties
Nov 5, 2026last inspection

Since 2018, OSHA inspectors have visited Advanced Building Services, LLC in Texas 8 times.

The most recent inspection opened on Nov 5, 2026 as a planned inspection, in Pyote and is still open.

In all, OSHA issued 11 citation items: 7 serious, 1 repeat and 3 other-than-serious.

The proposed penalties came to $40,429; today they stand at $29,964, 26% less.

The rule cited most here is 1910.305 (electrical wiring methods), 6 times.

Among mining and oil and gas employers, the typical cited inspection since 2015 ends with a $2,883 penalty. Advanced Building Services, LLC averages $5,993 across 5 cited inspections.

Advanced Building Services, LLC: OSHA citation items per year, 2018 to 2026
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

398employers cited

9 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Advanced Building Services, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349269936 OPENED NOV 5, 2026Open

Planned · Complete · Safety · 2 employees at the site · Open

Precision Rig 597 7.8 Miles Ne Pyote, Pyote, TX 79777 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection so far.

Inspection 348736588 OPENED FEB 10, 2026Closed

Planned · Complete · Safety · 2 employees at the site · Closed Mar 20, 2026

Ensign Rig T124 11.7 Miles Nw Direction From Pecos, Pecos, TX 79772 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347660979 OPENED JUL 30, 2024Closed

Planned · Complete · Safety · 14 employees at the site · Closed Sep 20, 2024

Citadel Rig #6 10 Miles Se Direction From Verhalen, Verhalen, TX 79772 · Other Commercial and Industrial Machinery and Equipment Rental and Leasing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.334(a)(2)(i) · Using electrical equipment
Other-than-serious$770$500Aug 14, 2024Final

Inspection 347371387 OPENED MAR 25, 2024Closed

Unprogrammed other · Complete · Safety · 1 employee at the site · Closed May 28, 2024

2.9 Miles South East Rig 598, Pyote, TX 79777 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 346609852 OPENED APR 4, 2023Closed

Planned · Complete · Safety · 1 employee at the site · Closed Jul 28, 2025

Noram Rig #26 4.5 Miles N Direction From Pecos, Pecos, TX 79772 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$7,969$6,000Jun 5, 2023Final
Citation 1, item 2a
29 CFR 1910.303(b)(8)(i) · Electrical equipment, general requirements
Serious$7,969$6,000Jun 5, 2023Final
Citation 1, item 2b
29 CFR 1910.305(j)(1)(i) · Electrical wiring methods
Serious$0$0Jun 5, 2023Final
Citation 1, item 3
29 CFR 1910.305(a)(2)(x) · Electrical wiring methods
Serious$7,969$6,000Jun 5, 2023Final
Citation 1, item 4
29 CFR 1910.335(b)(1) · Safeguards for personnel protection
Serious$5,313$3,000Jun 5, 2023Final

Inspection 346372733 OPENED NOV 30, 2022Closed

Planned · Partial · Safety · 1 employee at the site · Closed Mar 21, 2023

Shortleaf A2, Well 9ua (31?28'5.56" N 103?11'21.8" W) 5 Miles Southwest Of Pyote, Pyote, TX 79777 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Repeat$2,656$2,000Feb 3, 2023Final

Inspection 345930309 OPENED APR 27, 2022Closed

Planned · Complete · Safety · 15 employees at the site · Closed Aug 1, 2022

Cactus Rig #171 King George Sa 5702 Well 2h 10.3 Miles W Direction From Monahans, Tx, Monahans, TX 79756 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$3,263$3,263Jul 5, 2022Final
Citation 2, item 1
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Other-than-serious$611$611Jul 5, 2022Final
Citation 2, item 2
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$611$611Jul 5, 2022Final

Inspection 343107496 OPENED APR 18, 2018Closed

Planned · Complete · Health · 2 employees at the site · Closed Nov 2, 2018

Lease Cwi Long C Well No. U 49h Trinidad Drilling Rig No. 123e, Pecos, TX 79772 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$3,298$1,979Oct 3, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(2)

(2) Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.

29 CFR 1910.303(b)(8)(i)

(8) Mounting and cooling of equipment. (i) Electric equipment shall be firmly secured to the surface on which it is mounted.

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.304(g)(5)

(5) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent, continuous, and effective.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.334 · Using electrical equipment

29 CFR 1910.335 · Safeguards for personnel protection

Other support activities for oil and gas operations employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.