OSHA SearchOSHA records by employer

Advanced Drainage Systems Inc: OSHA inspections and violations

Fairmont, Minnesota · Plastics Material and Resin Manufacturing · NAICS 325211

2inspections
4citation items
$14,700current penalties
Apr 24, 2024last inspection

Advanced Drainage Systems Inc has 2 OSHA inspections on record in Minnesota, the first in 2021.

OSHA's last visit started on Apr 24, 2024 as a planned inspection, in Fairmont.

Across those inspections OSHA issued 4 citation items: 2 serious and 2 other-than-serious.

OSHA proposed $23,100 in penalties. After settlements and reviews the total is $14,700, down 36%.

Most often, OSHA cited 1910.333, working near live electrical parts (2 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Advanced Drainage Systems Inc averages $7,350 over 2 cited inspections in that time.

Advanced Drainage Systems Inc also files yearly injury logs with OSHA, summarized below.

Advanced Drainage Systems Inc: OSHA citation items per year, 2021 to 2024
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

373employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Advanced Drainage Systems Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Company-wide record

OSHA records show Advanced Drainage Systems Inc at 39 sites in 15 states. Together they've had 88 inspections and $224,152 in current penalties.

We match records by employer name and industry, so these sites are likely the same company, not certainly. Franchises and subsidiaries can file under one name.

Included with any plan: the site-by-site record for all 39 sites, with repeat and willful violations and citations per year for the whole company. Already a subscriber? Sign in.

See plans

Inspection history

Inspection 347439465 OPENED APR 24, 2024Closed

Planned · Complete · Safety · 80 employees at the site · Closed Sep 4, 2024

1001 Timberlake Rd, Fairmont, MN 56031 · Plastics Material and Resin Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$2,100$2,100Apr 30, 2024Final

Inspection 345512222 OPENED AUG 31, 2021Closed

Planned · Partial · Safety · 69 employees at the site · Closed Mar 8, 2022

1001 Timberlake Rd, Fairmont, MN 56031 · Plastics Material and Resin Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.333(a)(1) · Working near live electrical parts
Serious$7,000$4,200Nov 4, 2021Final
Citation 1, item 2
29 CFR 1910.333(a)(2) · Working near live electrical parts
Serious$7,000$4,200Nov 4, 2021Final
Citation 1, item 3
29 CFR 1910.335(a)(1)(i) · Safeguards for personnel protection
Other-than-serious$7,000$4,200Nov 4, 2021Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Fairmont site logged 1 recordable injury or illness among about 89 workers: 1.3 per 100 full-time workers, against a median of 2.6 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Fairmont site
Fairmont · 2025
89 101.32.6
Advanced Drainage Systems Inc. --Fairmont
Fairmont · 2019
59 324.92.6

Included with any plan: 6 more yearly logs from these sites, back to 2017, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.333 · Working near live electrical parts

29 CFR 1910.333(a)(1)

(1) Deenergized parts. Live parts to which an employee may be exposed shall be deenergized before the employee works on or near them, unless the employer can demonstrate that deenergizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations. Live parts that operate at less than 50 volts to ground need not be deenergized if there will be no increased exposure to electrical burns or to explosion due to electric arcs.

29 CFR 1910.333(a)(2)

(2) Energized parts. If the exposed live parts are not deenergized (i.e., for reasons of increased or additional hazards or infeasibility), other safety-related work practices shall be used to protect employees who may be exposed to the electrical hazards involved. Such work practices shall protect employees against contact with energized circuit parts directly with any part of their body or indirectly through some other conductive object. The work practices that are used shall be suitable for the conditions under which the work is to be performed and for the voltage level of the exposed electric conductors or circuit parts. Specific work practice requirements are detailed in paragraph (c) of this section.

29 CFR 1910.335 · Safeguards for personnel protection

29 CFR 1910.335(a)(1)(i)

(a) Use of protective equipment—(1) Personal protective equipment. (i) Employees working in areas where there are potential electrical hazards shall be provided with, and shall use, electrical protective equipment that is appropriate for the specific parts of the body to be protected and for the work to be performed.

29 CFR 5205.116

Other plastics material and resin manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.