OSHA SearchOSHA records by employer

Alejandro Ramirez: OSHA inspections and violations

Oklahoma City, Oklahoma · Framing Contractors · NAICS 238130

2inspections
4citation items
$8,122current penalties
Aug 22, 2017last inspection

OSHA has inspected Alejandro Ramirez 2 times in Oklahoma since 2012.

The latest one began on Aug 22, 2017 as a planned inspection, in Moore.

Those inspections ended with 4 citation items: 4 serious.

Penalties were first proposed at $8,122 and still stand at $8,122.

Fall protection in construction comes up most often in these citations: 2 items under 1926.501.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,078, and Alejandro Ramirez averages $5,322 (1 cited inspection).

Alejandro Ramirez: OSHA citation items per year, 2012 to 2017
Citation items per year, by inspection date.

Want to know if OSHA cites Alejandro Ramirez again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 342569837 OPENED AUG 22, 2017Closed

Planned · Partial · Safety · 4 employees at the site · Closed Sep 30, 2022

3433 Superior Spear Dr., Moore, OK 73160 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$1,630$1,630Sep 15, 2017Final
Citation 1, item 2
29 CFR 1926.304(d) · Woodworking tools
Serious$1,247$1,247Sep 15, 2017Final
Citation 1, item 3
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,445$2,445Sep 15, 2017Final

Inspection 335557591 OPENED JUL 31, 2012Closed

Unprogrammed other · Partial · Safety · 7 employees at the site · Closed Aug 2, 2016

2409 Nw 155th Street, Oklahoma City, OK 73170 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,800$2,800Dec 4, 2012Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(d)

(d) Guarding. All portable, power-driven circular saws shall be equipped with guards above and below the base plate or shoe. The upper guard shall cover the saw to the depth of the teeth, except for the minimum arc required to permit the base to be tilted for bevel cuts. The lower guard shall cover the saw to the depth of the teeth, except for the minimum arc required to allow proper retraction and contact with the work. When the tool is withdrawn from the work, the lower guard shall automatically and instantly return to the covering position.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(13)

(13) Residential construction. Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure. Exception: When the employer can demonstrate that it is infeasible or creates a greater hazard to use these systems, the employer shall develop and implement a fall protection plan which meets the requirements of paragraph (k) of § 1926.502.

Other framing contractors employers in Oklahoma

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.