OSHA SearchOSHA records by employer

Anderson Pump Service, Inc.: OSHA inspections and violations

Chicago, Illinois · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

1inspections
5citation items
$25,000current penalties
Jul 26, 2019last inspection

OSHA inspectors have visited Anderson Pump Service, Inc. in Illinois one time.

It opened on Jul 26, 2019 on a referral, in Chicago.

In all, OSHA issued 5 citation items: 5 serious.

The proposed penalties came to $37,128; today they stand at $25,000, 33% less.

The rule cited most here is 1910.146 (permit-required confined spaces), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Anderson Pump Service, Inc. averages $25,000 across 1 cited inspection.

Anderson Pump Service, Inc.: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

428employers cited

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch Anderson Pump Service, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344184593 OPENED JUL 26, 2019Closed

Referral · Partial · Health · 64 employees at the site · Closed Feb 7, 2020

1611 E. 95th Street, Chicago, IL 60616 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Incident on Jul 26, 2019: Employee receives burns while repairing gas pump

At 8:50 a.m. on July 26, 2019, Employee #1, electrician, was attempting to remove a bolt from a sump pit at a gas service station in order to repair the gas pump. Employee #1 was using a reciprocating (sawzall) saw attempting to cut the bolt off so he could get to the wires to make repairs. As he was sawing the metal bolt, there was a flash/flame of fire that started very quickly and was extinguished right away. Employee #1 received severe burns to several parts of the upper body. A coworker was standing at the sump pit when this fire occurred, and assisted Employee #1 out of the sump pit. Employee #1 was transported to the local hospital, where he was admitted to treat the burns.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.106(g)(8) · Flammable liquids
Serious$9,282$6,250Jan 9, 2020Final
Citation 1, item 2a
29 CFR 1910.146(c)(4) · Permit-required confined spaces
Serious$9,282$6,250Jan 9, 2020Final
Citation 1, item 2b
29 CFR 1910.146(d)(5)(i) · Permit-required confined spaces
Serious$0$0Jan 9, 2020Final
Citation 1, item 2c
29 CFR 1910.146(e)(1) · Permit-required confined spaces
Serious$9,282$6,250Jan 9, 2020Final
Citation 1, item 2d
29 CFR 1910.146(g)(1) · Permit-required confined spaces
Serious$9,282$6,250Jan 9, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(g)(8)

(8) Sources of ignition. In addition to the previous restrictions of this paragraph, the following shall apply: There shall be no smoking or open flames in the areas used for fueling, servicing fuel systems for internal combustion engines, receiving or dispensing of flammable liquids. Conspicuous and legible signs prohibiting smoking shall be posted within sight of the customer being served. The motors of all equipment being fueled shall be shut off during the fueling operation.

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.146(c)(4)

(4) If the employer decides that its employees will enter permit spaces, the employer shall develop and implement a written permit space program that complies with this section. The written program shall be available for inspection by employees and their authorized representatives.

29 CFR 1910.146(d)(5)(i)

(i) Test conditions in the permit space to determine if acceptable entry conditions exist before entry is authorized to begin, except that, if isolation of the space is infeasible because the space is large or is part of a continuous system (such as a sewer), pre-entry testing shall be performed to the extent feasible before entry is authorized and, if entry is authorized, entry conditions shall be continuously monitored in the areas where authorized entrants are working;

Other electrical contractors and other wiring installation contractors employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.