OSHA SearchOSHA records by employer

Anthony Nunez: OSHA inspections and violations

Lubbock, Texas · Masonry Contractors · NAICS 238140

1inspections
4citation items
$7,458current penalties
May 4, 2022last inspection

OSHA has inspected Anthony Nunez once in Texas.

The inspection began on May 4, 2022 as a planned inspection, in Lubbock.

That inspection ended with 4 citation items: 4 serious.

Penalties were first proposed at $12,430 and now stand at $7,458, 40% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Anthony Nunez averages $7,458 (1 cited inspection).

Anthony Nunez: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

Want to know if OSHA cites Anthony Nunez again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 345938666 OPENED MAY 4, 2022Closed

Planned · Partial · Safety · 3 employees at the site · Closed Aug 5, 2024

5709 119th St, Lubbock, TX 79424 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,486$1,492Jul 22, 2022Final
Citation 1, item 2
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$3,729$2,237Jul 22, 2022Final
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$3,729$2,237Jul 22, 2022Final
Citation 1, item 4
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$2,486$1,492Jul 22, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

Other masonry contractors employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.