OSHA SearchOSHA records by employer

Arcadia Electrical Co., Inc.: OSHA inspections and violations

Staten Island, New York · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

2inspections
6citation items
$27,109current penalties
Jul 25, 2022last inspection

OSHA has inspected Arcadia Electrical Co., Inc. 2 times in New York since 1997.

The latest one began on Jul 25, 2022 after a fatality or catastrophe, in New York.

Those inspections ended with 6 citation items: 4 serious and 2 other-than-serious.

Penalties were first proposed at $30,109 and now stand at $27,109, 10% lower after settlements or reviews.

Job-site wiring comes up most often in these citations: 2 items under 1926.405.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Arcadia Electrical Co., Inc. averages $24,109 (1 cited inspection).

1 inspection on this page followed a fatal incident.

Arcadia Electrical Co., Inc.: OSHA citation items per year, 1997 to 2022
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

353employers cited

8 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Arcadia Electrical Co., Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346108236 OPENED JUL 25, 2022Closed

Fatality or catastrophe · Partial · Safety · 1 employee at the site · Closed Nov 10, 2026

125 Broad Street, New York, NY 10004 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Incident on Jul 20, 2022 (fatal): Employee contacts live electricity and falls from ladder

At 1:30 p.m. on July 20, 2022, an employee was troubleshooting electrical work. He contacted live electricity and fell from a ladder. He died 3 days later at the hospital.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.333(a)(2) · Working near live electrical parts
Other-than-serious$14,063$14,063Jan 18, 2023Final
Citation 2, item 1
29 CFR 1904.39(a)(2) · Reporting deaths and severe injuries
Other-than-serious$10,046$10,046Jan 18, 2023Final

Inspection 113897631 OPENED OCT 28, 1997Closed

Unprogrammed other · Complete · Safety · 5 employees at the site · Closed May 18, 1998

2505-2535 Richmond Avenue, Staten Island, NY 10314 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Serious$1,500$750Nov 5, 1997Closed
Citation 1, item 2
29 CFR 1926.405(a)(2)(iie) · Job-site wiring
Serious$1,500$750Nov 5, 1997Closed
Citation 1, item 3
29 CFR 1926.405(j)(1)(i) · Job-site wiring
Serious$1,500$750Nov 5, 1997Closed
Citation 1, item 4
29 CFR 1926.416(e)(1) · Electrical safety in construction
Serious$1,500$750Nov 5, 1997Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.39 · Reporting deaths and severe injuries

29 CFR 1904.39(a)(2)

(2) Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, you must report the in-patient hospitalization, amputation, or loss of an eye to OSHA.

29 CFR 1910.333 · Working near live electrical parts

29 CFR 1910.333(a)(2)

(2) Energized parts. If the exposed live parts are not deenergized (i.e., for reasons of increased or additional hazards or infeasibility), other safety-related work practices shall be used to protect employees who may be exposed to the electrical hazards involved. Such work practices shall protect employees against contact with energized circuit parts directly with any part of their body or indirectly through some other conductive object. The work practices that are used shall be suitable for the conditions under which the work is to be performed and for the voltage level of the exposed electric conductors or circuit parts. Specific work practice requirements are detailed in paragraph (c) of this section.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.416 · Electrical safety in construction

Other electrical contractors and other wiring installation contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.