OSHA SearchOSHA records by employer

Art Roofing LLC: OSHA inspections and violations

Portland, Oregon · Other Building Finishing Contractors · NAICS 238390

1inspections
5citation items
$7,893current penalties
May 28, 2026last inspection

OSHA inspectors have visited Art Roofing LLC in Oregon one time.

It opened on May 28, 2026 after a complaint, in Portland and is still open.

In all, OSHA issued 5 citation items: 5 serious.

The penalties, $7,893 in total, stand where OSHA first set them.

The rule cited most here is 1926.1053 (ladders in construction), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Art Roofing LLC averages $7,893 across 1 cited inspection.

Art Roofing LLC: OSHA citation items per year, 2026 to 2026
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

388employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Art Roofing LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348968637 OPENED MAY 28, 2026Open

Complaint · Partial · Safety · 6 employees at the site · Open

10300 Se Raymond St, Portland, OR 97266 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Serious$3,037$3,037Jul 6, 2026Final
Citation 1, item 2
29 CFR OAR 437-003-1501(3)-2
Serious$1,214$1,214Jul 6, 2026Final
Citation 1, item 3
29 CFR OAR 437-003-0134(8)(A)
Serious$1,214$1,214Jul 6, 2026Final
Citation 1, item 4
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$1,214$1,214Jul 6, 2026Final
Citation 1, item 5
29 CFR 1926.1053(b)(16) · Ladders in construction
Serious$1,214$1,214Jul 6, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.1053(b)(16)

(16) Portable ladders with structural defects, such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components, shall either be immediately marked in a manner that readily identifies them as defective, or be tagged with “Do Not Use” or similar language, and shall be withdrawn from service until repaired.

Other other building finishing contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.