OSHA SearchOSHA records by employer

Atlas Manufacturing: OSHA inspections and violations

Minneapolis, Minnesota · Sheet Metal Work Manufacturing · NAICS 332322

4inspections
11citation items
$3,655current penalties
Oct 8, 2026last inspection

Atlas Manufacturing has 4 OSHA inspections on record in Minnesota, the first in 2002.

OSHA's last visit started on Oct 8, 2026 as a planned inspection, in Minneapolis.

Across those inspections OSHA issued 11 citation items: 10 serious and 1 other-than-serious.

OSHA proposed $5,350 in penalties. After settlements and reviews the total is $3,655, down 32%.

Most often, OSHA cited 1910.217, mechanical power presses (4 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Atlas Manufacturing averages $540 over 1 cited inspection in that time.

Atlas Manufacturing: OSHA citation items per year, 2002 to 2026
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

369employers cited

6 of them in the same industry

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Atlas Manufacturing and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349213306 OPENED OCT 8, 2026Closed

Planned · Complete · Safety · 78 employees at the site · Closed Nov 12, 2026

2950 Weeks Ave Se, Minneapolis, MN 55414 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$900$540Oct 19, 2026Final

Inspection 309574739 OPENED NOV 7, 2005Closed

Planned · Complete · Safety · 67 employees at the site · Closed Mar 3, 2006

2950 Weeks Av Se, Minneapolis, MN 55414 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Serious$600$420Nov 21, 2005Closed
Citation 1, item 2
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$450$315Nov 21, 2005Closed
Citation 1, item 3
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$900$630Nov 21, 2005Closed
Citation 1, item 4a
29 CFR 1910.217(c)(1)(i) · Mechanical power presses
Serious$750$525Nov 21, 2005Closed
Citation 1, item 4b
29 CFR 1910.217(c)(5)(i) · Mechanical power presses
Serious$0$0Nov 21, 2005Closed
Citation 1, item 5
29 CFR 1910.217(e)(1)(i) · Mechanical power presses
Serious$450$315Nov 21, 2005Closed
Citation 1, item 6
29 CFR 1910.217(e)(3) · Mechanical power presses
Serious$450$315Nov 21, 2005Closed
Citation 2, item 1
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$150$105Nov 21, 2005Closed

Inspection 305878787 OPENED NOV 19, 2002Closed

Planned · No inspection · Safety · 65 employees at the site · Closed Nov 19, 2002

2950 Weeks Av Se, Minneapolis, MN 55414 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 304804396 OPENED JAN 8, 2002Closed

Planned · Complete · Safety · 52 employees at the site · Closed Mar 18, 2002

2950 Weeks Av Se, Minneapolis, MN 55414 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.151(c) · First aid and eyewash
Serious$400$280Jan 24, 2002Closed
Citation 1, item 2
29 CFR 1910.219(b)(1) · Belts, pulleys and power-transmission parts
Serious$300$210Jan 24, 2002Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.212 · Machine guarding

29 CFR 1910.217 · Mechanical power presses

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.305 · Electrical wiring methods

Other sheet metal work manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.