OSHA SearchOSHA records by employer

Aussie Built Construction, Inc.: OSHA inspections and violations

Chesapeake, Virginia · Commercial and Institutional Building Construction · NAICS 236220

1inspections
3citation items
$650current penalties
Jun 21, 2024last inspection

OSHA inspectors have visited Aussie Built Construction, Inc. in Virginia one time.

It opened on Jun 21, 2024 after a complaint, in Chesapeake.

In all, OSHA issued 3 citation items: 3 serious.

The penalties, $650 in total, stand where OSHA first set them.

The rule cited most here is 1926.1101 (asbestos in construction), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. Aussie Built Construction, Inc. averages $650 across 1 cited inspection.

Aussie Built Construction, Inc.: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites Aussie Built Construction, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347568107 OPENED JUN 21, 2024Closed

Complaint · Partial · Health · 1 employee at the site · Closed Nov 18, 2025

4331 Bainbridge Blvd., Chesapeake, VA 23324 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.1101(g)(8)(iii)(a) · Asbestos in construction
Serious$650$650Oct 21, 2024Final
Citation 1, item 1b
29 CFR 1926.1101(g)(8)(iii)(c) · Asbestos in construction
Serious$0$0Oct 21, 2024Final
Citation 1, item 1c
29 CFR 1926.1101(k)(3)(i) · Asbestos in construction
Serious$0$0Oct 21, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1101 · Asbestos in construction

29 CFR 1926.1101(g)(8)(iii)(a)

(A) Cutting, abrading or breaking siding, shingles, or transite panels, shall be prohibited unless the employer can demonstrate that methods less likely to result in asbestos fiber release cannot be used.

29 CFR 1926.1101(g)(8)(iii)(c)

(C) Unwrapped or unbagged panels or shingles shall be immediately lowered to the ground via covered dust-tight chute, crane or hoist, or placed in an impervious waste bag or wrapped in plastic sheeting and lowered to the ground no later than the end of the work shift.

29 CFR 1926.1101(k)(3)(i)

(i) Before work in areas containing ACM and PACM is begun; employers shall identify the presence, location, and quantity of ACM, and/or PACM therein pursuant to paragraph (k)(1)(i) of this section.

Other commercial and institutional building construction employers in Virginia

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.