Axium Plastics, LLC has 2 OSHA inspections on record in Georgia, the first in 2023.
OSHA's last visit started on Oct 10, 2023 after a complaint, in Lawrenceville.
Across those inspections OSHA issued 4 citation items: 2 serious and 2 other-than-serious.
OSHA proposed $19,702 in penalties. After settlements and reviews the total is $8,915, down 55%.
Most often, OSHA cited 1910.37, exit routes (2 items).
For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Axium Plastics, LLC averages $4,458 over 2 cited inspections in that time.
Axium Plastics, LLC also files yearly injury logs with OSHA, summarized below.
Citation items per year, by inspection date.
Georgia · latest 90 days of OSHA records
145employers cited
Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.
OSHA records show Axium Plastics, LLC at 2 sites in 2 states. Together they've had 5 inspections and $21,230 in current penalties.
We match records by employer name and industry, so these sites are likely the same company, not certainly. Franchises and subsidiaries can file under one name.
Included with any plan: the site-by-site record for all 2 sites, with repeat and willful violations and citations per year for the whole company. Already a subscriber? Sign in.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2018, the Lawrenceville site logged 4 recordable injuries or illnesses among about 150 workers: 2.4 per 100 full-time workers, against a median of 2.6 for its industry. Those cases cost 75 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Axium Plastics GA
Lawrenceville · 2018
150
4
3
2.4
2.6
Included with any plan: 2 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(c) Where the eyes or body of any person may be exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within the work area for immediate emergency use.
29 CFR 1910.303 · Electrical equipment, general requirements
29 CFR 1910.303(g)(1)
(1) Space about electric equipment. Sufficient access and working space shall be provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment.
(3) Exit routes must be free and unobstructed. No materials or equipment may be placed, either permanently or temporarily, within the exit route. The exit access must not go through a room that can be locked, such as a bathroom, to reach an exit or exit discharge, nor may it lead into a dead-end corridor. Stairs or a ramp must be provided where the exit route is not substantially level.
Other plastics bottle manufacturing employers in Georgia
Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.