OSHA SearchOSHA records by employer

Banister Construction, Inc.: OSHA inspections and violations

Columbus, Indiana · Finish Carpentry Contractors · NAICS 238350

3inspections
9citation items
$1,075current penalties
May 23, 2022last inspection

Banister Construction, Inc. has 3 OSHA inspections on record in Indiana, the first in 2010.

OSHA's last visit started on May 23, 2022 as a planned inspection, in Columbus.

Across those inspections OSHA issued 9 citation items: 8 serious and 1 other-than-serious.

OSHA proposed $1,075 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.405, job-site wiring (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Banister Construction, Inc. averages $550 over 1 cited inspection in that time.

Banister Construction, Inc.: OSHA citation items per year, 2010 to 2022
Citation items per year, by inspection date.

Indiana · latest 90 days of OSHA records

79employers cited

Get notified the morning OSHA posts each new citation in Indiana: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Indiana

Checking a subcontractor, a client or your own company? Watch Banister Construction, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345977334 OPENED MAY 23, 2022Closed

Planned · Complete · Safety · 4 employees at the site · Closed Sep 29, 2022

3697 Sycamore Bend Way North, Columbus, IN 47201 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.150(c)(1)(i) · Fire protection
Serious$100$100Jun 21, 2022Final
Citation 1, item 2a
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$150$150Jun 21, 2022Final
Citation 1, item 2b
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$0$0Jun 21, 2022Final
Citation 1, item 3a
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$300$300Jun 21, 2022Final
Citation 1, item 3b
29 CFR 1926.405(j)(1)(i) · Job-site wiring
Serious$0$0Jun 21, 2022Final

Inspection 313904088 OPENED APR 6, 2010Closed

Unprogrammed other · Complete · Safety · 4 employees at the site · Closed Jul 16, 2010

5055 Boca Grande, Columbus, IN 47203 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.304(f) · Woodworking tools
Serious$525$525May 20, 2010Closed
Citation 1, item 1b
29 CFR 1926.304(f) · Woodworking tools
Serious$0$0May 20, 2010Closed
Citation 1, item 1c
29 CFR 1926.304(i)(1) · Woodworking tools
Serious$0$0May 20, 2010Closed

Inspection 313905507 OPENED JAN 5, 2010Closed

Unprogrammed other · Complete · Safety · 6 employees at the site · Closed May 17, 2010

5055 Boca Grande Boulevard, Columbus, IN 47203 · Finish Carpentry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.150(c)(1)(i) · Fire protection
Other-than-serious$0$0Feb 4, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.150 · Fire protection

29 CFR 1926.150(c)(1)(i)

(c) Portable firefighting equipment—(1) Fire extinguishers and small hose lines. (i) A fire extinguisher, rated not less than 2A, shall be provided for each 3,000 square feet of the protected building area, or major fraction thereof. Travel distance from any point of the protected area to the nearest fire extinguisher shall not exceed 100 feet.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(f)

(f) Other requirements. All woodworking tools and machinery shall meet other applicable requirements of American National Standards Institute, 01.1-1961, Safety Code for Woodworking Machinery.

29 CFR 1926.304(i)(1)

(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.405 · Job-site wiring

Other finish carpentry contractors employers in Indiana

Alert subscribers get notified of each newly cited employer in Indiana the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.