OSHA SearchOSHA records by employer

Barr Concrete: OSHA inspections and violations

Washington, District of Columbia · Poured Concrete Foundation and Structure Contractors · NAICS 238110

13inspections
18citation items
$39,778current penalties
Apr 24, 2017last inspection

Since 2002, OSHA inspectors have visited Barr Concrete in District of Columbia 13 times.

The most recent inspection opened on Apr 24, 2017 on a referral, in Washington.

In all, OSHA issued 18 citation items: 6 serious, 2 repeat and 10 other-than-serious.

The proposed penalties came to $54,703; today they stand at $39,778, 27% less.

The rule cited most here is 1926.501 (fall protection in construction), 8 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. Barr Concrete averages $7,374 across 2 cited inspections.

Barr Concrete: OSHA citation items per year, 2002 to 2017
Citation items per year, by inspection date.

Want to know if OSHA cites Barr Concrete again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 342272309 OPENED APR 24, 2017Closed

Referral · Partial · Safety · 130 employees at the site · Closed Sep 28, 2017

315 H Street Ne, Washington, DC 20002 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(e)(1)(ii) · Trench protection
Serious$12,548$12,548Aug 31, 2017Final

Inspection 341393635 OPENED APR 5, 2016Closed

Planned · Partial · Safety · 3 employees at the site · Closed Jun 15, 2016

1311 13th Street, Nw, Washington, DC 20005 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$3,080$2,200May 31, 2016Final

Inspection 339531303 OPENED DEC 6, 2013Closed

Unprogrammed other · Partial · Safety · 15 employees at the site · Closed Feb 19, 2014

1350 Maryland Ave Ne, Washington, DC 20003 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 336303391 OPENED AUG 31, 2012Closed

Referral · Partial · Safety · 25 employees at the site · Closed Aug 31, 2012

625 Michigan Ave., Ne, Washington, DC 20006 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 333977825 OPENED APR 11, 2012Closed

Unprogrammed other · Complete · Safety · 40 employees at the site · Closed Jul 23, 2012

716 Monroe Street, Ne, Washington, DC 20017 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.502(k)(7) · Fall protection systems
Serious$3,600$1,800Jun 28, 2012Final
Citation 2, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Repeat$7,200$3,600Jun 28, 2012Final

Inspection 315197269 OPENED FEB 9, 2011Closed

Planned · Complete · Safety · 21 employees at the site · Closed Apr 28, 2011

4619 41st Street, Nw, Washington, DC 20016 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$5,600$5,600Apr 6, 2011Closed

Inspection 313666430 OPENED AUG 24, 2009Closed

Planned · Complete · Safety · 25 employees at the site · Closed Oct 13, 2009

2708 Porter St., Nw, Washington, DC 20008 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$900$630Sep 23, 2009Closed
Citation 1, item 2b
29 CFR 1926.501(b)(2)(i) · Fall protection in construction
Serious$0$0Sep 23, 2009Closed

Inspection 312331754 OPENED JUL 30, 2008Closed

Referral · Complete · Safety · 55 employees at the site · Closed Sep 2, 2008

700 6th Street, Nw, Washington, DC 20001 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.250(a)(1) · General requirements for storage
Other-than-serious$2,275$1,500Aug 11, 2008Closed
Citation 1, item 1b
29 CFR 1926.250(b)(1) · General requirements for storage
Other-than-serious$0$0Aug 11, 2008Closed
Citation 1, item 1c
29 CFR 1926.250(b)(8)(i) · General requirements for storage
Other-than-serious$0$0Aug 11, 2008Closed
5 older inspections

Inspection 309465771 OPENED DEC 21, 2005Closed

Referral · Partial · Safety · 27 employees at the site · Closed Dec 22, 2005

1401 Church Street, Nw, Washington, DC 20002 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 309389575 OPENED OCT 4, 2005Closed

Referral · Complete · Safety · 35 employees at the site · Closed Nov 2, 2005

1401 Q Street, Nw, Washington, DC 20009 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(i)(2)(i) · Electrical equipment on job sites
Other-than-serious$1,200$0Oct 7, 2005Closed
Citation 1, item 2
29 CFR 1926.501(b)(2)(i) · Fall protection in construction
Other-than-serious$4,000$2,000Oct 7, 2005Closed

Inspection 306696337 OPENED JUL 22, 2004Closed

Referral · Complete · Safety · 12 employees at the site · Closed Sep 2, 2004

1401 Church Street, Nw, Washington, DC 20002 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Repeat$6,000$3,000Aug 2, 2004Closed

Inspection 305707663 OPENED JAN 16, 2003Closed

Unprogrammed other · Complete · Safety · 13 employees at the site · Closed May 19, 2003

700 Pennsylvania Avenue, N.w., Washington, DC 20004 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Unclassified$1,500$1,000Feb 3, 2003Closed
Citation 1, item 2
29 CFR 1926.1051(a) · Stairways and Ladders: general requirements
Other-than-serious$900$0Feb 3, 2003Closed
Citation 2, item 1
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Unclassified$2,400$2,400Feb 3, 2003Closed

Inspection 304759137 OPENED JUN 19, 2002Closed

Referral · Complete · Safety · 40 employees at the site · Closed Jul 29, 2002

1300 N Street, Nw, Washington, DC 20005 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Unclassified$2,500$2,500Jun 24, 2002Closed
Citation 1, item 2
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Unclassified$1,000$1,000Jun 24, 2002Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1051 · Stairways and Ladders: general requirements

29 CFR 1926.1051(a)

(a) A stairway or ladder shall be provided at all personnel points of access where there is a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist is provided.

29 CFR 1926.250 · General requirements for storage

29 CFR 1926.250(a)(1)

(a) General. (1) All materials stored in tiers shall be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse.

29 CFR 1926.250(b)(1)

(b) Material storage. (1) Material stored inside buildings under construction shall not be placed within 6 feet of any hoistway or inside floor openings, nor within 10 feet of an exterior wall which does not extend above the top of the material stored.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.652 · Trench protection

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

Other poured concrete foundation and structure contractors employers in District of Columbia

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.