OSHA SearchOSHA records by employer

Batista Crane and Rigging, LLC: OSHA inspections and violations

Savannah, Georgia · All Other Specialty Trade Contractors · NAICS 238990

2inspections
4citation items
$0current penalties
May 4, 2022last inspection

Since 2019, OSHA inspectors have visited Batista Crane and Rigging, LLC in Georgia 2 times.

The most recent inspection opened on May 4, 2022, in Rincon.

In all, OSHA issued 4 citation items: 4 other-than-serious.

No penalty came with these citations.

The rule cited most here is 1926.1416 (operational aids), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Batista Crane and Rigging, LLC averages $0 across 2 cited inspections.

Batista Crane and Rigging, LLC: OSHA citation items per year, 2019 to 2022
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

147employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Batista Crane and Rigging, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345940118 OPENED MAY 4, 2022Closed

Unprogrammed other · Complete · Safety · 3 employees at the site · Closed Sep 23, 2022

Lot 3 Franklin's Walk, Rincon, GA 31326 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1427(a) · Operator training, certification, and evaluation
Other-than-serious$0$0Jul 8, 2022Final

Inspection 343835021 OPENED MAR 7, 2019Closed

Unprogrammed other · Complete · Safety · 2 employees at the site · Closed Dec 16, 2019

212 Whitestone Dr, Savannah, GA 31410 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.1416(e)(3) · Operational aids
Other-than-serious$0$0Jun 24, 2019Final
Citation 1, item 1b
29 CFR 1926.1416(e)(4) · Operational aids
Other-than-serious$0$0Jun 24, 2019Final
Citation 1, item 2
29 CFR 1926.1422 · Signals—hand signal chart
Other-than-serious$0$0Jun 24, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1416 · Operational aids

29 CFR 1926.1416(e)(3)

(3) Boom length indicator if the equipment has a telescopic boom, except where the rated capacity is independent of the boom length. Temporary alternative measures. One or more of the following methods must be used:

29 CFR 1926.1416(e)(4)

(e) Category II operational aids and alternative measures. Operational aids listed in this paragraph that are not working properly must be repaired no later than 30 calendar days after the deficiency occurs. Exception: If the employer documents that it has ordered the necessary parts within 7 calendar days of the occurrence of the deficiency, and the part is not received in time to complete the repair in 30 calendar days, the repair must be completed within 7 calendar days of receipt of the parts. See § 1926.1417(j) for additional requirements.

29 CFR 1926.1422 · Signals—hand signal chart

29 CFR 1926.1427 · Operator training, certification, and evaluation

29 CFR 1926.1427(a)

(a) General requirements for operators. The employer must ensure that each operator is trained, certified/licensed, and evaluated in accordance with this section before operating any equipment covered under subpart CC, except for the equipment listed in paragraph (a)(2) of this section.

Other all other specialty trade contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.