OSHA SearchOSHA records by employer

Be Stucco, Inc.: OSHA inspections and violations

Hamburg, Pennsylvania · Masonry Contractors · NAICS 238140

3inspections
9citation items
$34,486current penalties
Jul 15, 2021last inspection

Be Stucco, Inc. has 3 OSHA inspections on record in Pennsylvania, the first in 2005.

OSHA's last visit started on Jul 15, 2021, in Lehighton.

Across those inspections OSHA issued 9 citation items: 2 serious, 6 repeat and 1 other-than-serious.

OSHA proposed $61,466 in penalties. After settlements and reviews the total is $34,486, down 44%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (6 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Be Stucco, Inc. averages $5,993 over 2 cited inspections in that time.

Be Stucco, Inc.: OSHA citation items per year, 2005 to 2021
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

287employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch Be Stucco, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345425383 OPENED JUL 15, 2021Closed

Unprogrammed other · Complete · Safety · 6 employees at the site · Closed Nov 19, 2021

2128 Blakeslee Blvd Dr. East, Lehighton, PA 18235 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.452(w)(1) · Rules for each type of scaffold
Other-than-serious$5,266$5,266Oct 14, 2021Final

Inspection 341352854 OPENED MAR 24, 2016Closed

Referral · Partial · Safety · 5 employees at the site · Closed Aug 15, 2016

2160 Macarthur Road, Whitehall, PA 18052 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Repeat$4,000$2,000Jul 13, 2016Final
Citation 1, item 2
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Repeat$4,000$2,000Jul 13, 2016Final
Citation 2, item 1
29 CFR 1926.454(a) · Scaffold training
Serious$3,200$2,720Jul 13, 2016Final

Inspection 308472042 OPENED JUN 1, 2005Closed

Complaint · Partial · Safety · 6 employees at the site · Closed Jan 30, 2006

Savage Toyota Dealership, Hamburg, PA 19526 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$3,000$1,500Jul 18, 2005Closed
Citation 2, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Repeat$6,000$3,000Jul 18, 2005Closed
Citation 2, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Repeat$15,000$7,500Jul 18, 2005Closed
Citation 2, item 3
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Repeat$15,000$7,500Jul 18, 2005Closed
Citation 2, item 4
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Repeat$6,000$3,000Jul 18, 2005Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.454 · Scaffold training

Other masonry contractors employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.