OSHA SearchOSHA records by employer

Benoy Masonry LLC: OSHA inspections and violations

Mcfarland, Wisconsin · Masonry Contractors · NAICS 238140

3inspections
5citation items
$2,630current penalties
Dec 11, 2019last inspection

Benoy Masonry LLC has 3 OSHA inspections on record in Wisconsin, the first in 2008.

OSHA's last visit started on Dec 11, 2019 after a complaint, in Sun Prairie.

Across those inspections OSHA issued 5 citation items: 5 serious.

OSHA proposed $2,900 in penalties. After settlements and reviews the total is $2,630, down 9%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Benoy Masonry LLC averages $2,000 over 1 cited inspection in that time.

1 inspection on this page followed a fatal incident.

Benoy Masonry LLC: OSHA citation items per year, 2008 to 2019
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

223employers cited

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Benoy Masonry LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344502547 OPENED DEC 11, 2019Closed

Complaint · Partial · Safety · 17 employees at the site · Closed Jan 10, 2020

1240 Stonewood Crossing, Sun Prairie, WI 53590 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 340422179 OPENED FEB 24, 2015Closed

Unprogrammed related · Partial · Safety · 22 employees at the site · Closed Jul 31, 2015

950 John Nolen Drive, Madison, WI 53713 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Incident on Feb 20, 2015 (fatal): Employee is crushed when masonry wall collapses

At approximately 7:30 a.m. on February 20, 2015, three iron workers were erecting a steel stairway on a multi-story apartment and retail building. The stairway was being erected inside a shaft that consisted of masonry walls on three sides. The iron workers had rigged a horizontal wire rope between to the east and west walls of the shaft near the top of the shaft on the 3rd floor. A ? ton Harrington Chain Hoist (Model CF4) was supported by the horizontal wire rope and the hoist was used to lift the steel staircase members that weighed between 28-and-123 pounds. The first two levels of the stairway were placed with this system on February 16 & 17, and work did not continue on February 18 & 19 due to extreme winter conditions. On the morning of February 20, the temperature was approximately 8 degrees Fahrenheit, with wind speeds of approximately 7 mph and max gusts of approximately 28 mph. The three iron workers were working from the first floor of the stairwell and were attempting to lift a stair stringer and then lower it for stairway access to the basement. The west section of the 3rd floor masonry wall that was supporting the horizontal wire rope collapsed into the stairwell. Iron worker #1 was welding from an 8 foot tall Werner step ladder that was on the first floor, leaning against the east wall. The collapsing section of wall that was approximately 11 blocks high and 7.5 blocks wide, struck iron worker #1 causing fatal injuries. The masonry walls had been erected for the first 3 floors a couple weeks prior to the accident, but the masonry walls were not complete and were planned to be extended for the remaining floors in the future. The masonry walls had also not been filled with grout nor had the permanent rebar been installed. The masonry wall was attached to the wood structure of the building, but the top portion was greater than 8 feet tall and was not braced to prevent overturning or collapse. A determination was not made to assure that the masonry walls could adequately support the rigging method used for the stairway. Iron worker #1 received crushing injuries to the head, spine, back, and ribs area, and was killed. the head, spine, back, and ribs area, and was killed.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.706(b) · Requirements for masonry construction
Serious$2,000$2,000Jun 26, 2015Final

Inspection 310767348 OPENED AUG 6, 2008Closed

Planned · Partial · Health · 4 employees at the site · Closed Dec 4, 2008

Brandt Park, Mcfarland, WI 53558 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(d)(1)(iii) · Respiratory protection
Serious$300$210Sep 4, 2008Closed
Citation 1, item 2
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$300$210Sep 4, 2008Closed
Citation 1, item 3a
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$300$210Sep 4, 2008Closed
Citation 1, item 3b
29 CFR 1926.451(c)(2)(iv) · Scaffolds, general requirements
Serious$0$0Sep 4, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(d)(1)(iii)

(iii) The employer shall identify and evaluate the respiratory hazard(s) in the workplace; this evaluation shall include a reasonable estimate of employee exposures to respiratory hazard(s) and an identification of the contaminant's chemical state and physical form. Where the employer cannot identify or reasonably estimate the employee exposure, the employer shall consider the atmosphere to be IDLH.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(6)

(6) Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Non-mandatory appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section.

29 CFR 1926.706 · Requirements for masonry construction

Other masonry contractors employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.