OSHA SearchOSHA records by employer

Bens Structural Fabrication Inc: OSHA inspections and violations

Waite Park, Minnesota · Fabricated Structural Metal Manufacturing · NAICS 332312

5inspections
10citation items
$1,600current penalties
Dec 3, 2025last inspection

OSHA has inspected Bens Structural Fabrication Inc 5 times in Minnesota since 2010.

The latest one began on Dec 3, 2025 as a planned inspection, in Waite Park.

Those inspections ended with 10 citation items: 7 serious and 3 other-than-serious.

Penalties were first proposed at $2,400 and now stand at $1,600, 33% lower after settlements or reviews.

Respiratory protection comes up most often in these citations: 3 items under 1910.134.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Bens Structural Fabrication Inc averages $345 (2 cited inspections).

Bens Structural Fabrication Inc also files yearly injury logs with OSHA, summarized below.

Bens Structural Fabrication Inc: OSHA citation items per year, 2010 to 2025
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

373employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Bens Structural Fabrication Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348625765 OPENED DEC 3, 2025Closed

Planned · Complete · Safety · 42 employees at the site · Closed Feb 2, 2026

475 Progress Rd, Waite Park, MN 56387 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(d)(3)(iii)(b)(2) · Respiratory protection
Other-than-serious$400$240Jan 6, 2026Final
Citation 1, item 2
29 CFR 1910.305(g)(1)(iv) · Electrical wiring methods
Other-than-serious$200$120Jan 6, 2026Final
Citation 1, item 3
29 CFR 1910.305(g)(2)(ii) · Electrical wiring methods
Other-than-serious$200$120Jan 6, 2026Final

Inspection 345119085 OPENED JAN 27, 2021Closed

Planned · Complete · Safety · 38 employees at the site · Closed Feb 24, 2021

475 Progress Rd, Waite Park, MN 56387 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection
Serious$300$210Feb 10, 2021Final

Inspection 342265048 OPENED APR 20, 2017Closed

Planned · Complete · Safety · 37 employees at the site · Closed May 11, 2017

475 Progress Rd, Waite Park, MN 56387 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 317158053 OPENED JUN 4, 2013Closed

Planned · Complete · Health · 47 employees at the site · Closed Aug 12, 2013

475 Progress Rd, Waite Park, MN 56387 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$400$280Jun 24, 2013Closed
Citation 1, item 2
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$400$280Jun 24, 2013Closed

Inspection 314561796 OPENED JUN 4, 2010Closed

Planned · Complete · Safety · 28 employees at the site · Closed Jul 14, 2010

475 Progress Rd, Waite Park, MN 56387 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(d)(1)(iii) · Guarding floor and wall openings and holes
Serious$150$105Jun 21, 2010Closed
Citation 1, item 2a
29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements
Serious$150$105Jun 21, 2010Closed
Citation 1, item 2b
29 CFR 1910.303(g)(1)(iii) · Electrical equipment, general requirements
Serious$0$0Jun 21, 2010Closed
Citation 1, item 3 Serious$200$140Jun 21, 2010Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Waite Park site logged 6 recordable injuries or illnesses among about 43 workers: 14.5 per 100 full-time workers, against a median of 3.6 for its industry. Those cases cost 8 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Ben's Structural Fabrication
Waite Park · 2025
43 6214.53.6

Included with any plan: 2 more yearly logs from these sites, back to 2023, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1910.134(d)(3)(iii)(b)(2)

(B) An air-purifying respirator, provided that:

29 CFR 1910.134(g)(1)(i)(a)

(A) Facial hair that comes between the sealing surface of the facepiece and the face or that interferes with valve function; or

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.95 · Noise

29 CFR 5205.675

Other fabricated structural metal manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.