OSHA SearchOSHA records by employer

Bent Pine Construction Co.: OSHA inspections and violations

St Marys, Georgia · New Housing For-Sale Builders · NAICS 236117

2inspections
8citation items
$9,391current penalties
Nov 15, 2017last inspection

OSHA has inspected Bent Pine Construction Co. 2 times in Georgia since 2005.

The latest one began on Nov 15, 2017 as a planned inspection, in Saint Marys.

Those inspections ended with 8 citation items: 8 serious.

Penalties were first proposed at $12,319 and now stand at $9,391, 24% lower after settlements or reviews.

Hazard communication comes up most often in these citations: 3 items under 1910.1200.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Bent Pine Construction Co. averages $4,391 (1 cited inspection).

Bent Pine Construction Co.: OSHA citation items per year, 2005 to 2017
Citation items per year, by inspection date.

Want to know if OSHA cites Bent Pine Construction Co. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 342774924 OPENED NOV 15, 2017Closed

Planned · Complete · Safety · 5 employees at the site · Closed May 24, 2018

6222 Charlie Smith Sr Highway, Saint Marys, GA 31558 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$1,996$1,198Apr 4, 2018Final
Citation 1, item 1b
29 CFR 1910.1200(g)(1) · Hazard communication
Serious$0$0Apr 4, 2018Final
Citation 1, item 1c
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Apr 4, 2018Final
Citation 1, item 2
29 CFR 1926.95(a) · Criteria for personal protective equipment
Serious$1,996$1,198Apr 4, 2018Final
Citation 1, item 3
29 CFR 1926.602(a)(9)(i) · Earthmovers and forklifts in construction
Serious$3,327$1,996Apr 4, 2018Final

Inspection 307406744 OPENED JAN 5, 2005Closed

Unprogrammed related · Complete · Safety · 1 employee at the site · Closed May 17, 2005

Lot 130 Cedar Hill Rd., St Marys, GA 31558 · New Housing For-Sale Builders · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$3,500$3,500May 3, 2005Closed
Citation 1, item 2
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$750$750May 3, 2005Closed
Citation 1, item 3
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$750$750May 3, 2005Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(g)(1)

(g) Safety data sheets. (1) Chemical manufacturers and importers shall obtain or develop a safety data sheet for each hazardous chemical they produce or import. Employers shall have a safety data sheet in the workplace for each hazardous chemical which they use.

29 CFR 1910.1200(h)(1)

(h) Employee information and training. (1) Employers shall provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. Information and training may be designed to cover categories of hazards (e.g., flammability, carcinogenicity) or specific chemicals. Chemical-specific information must always be available through labels and safety data sheets.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.602 · Earthmovers and forklifts in construction

29 CFR 1926.95 · Criteria for personal protective equipment

Other new housing for-sale builders employers in Georgia

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.