Big Island Crane Inc: OSHA inspections and violations

Kailua Kona, Hawaii · All Other Specialty Trade Contractors · NAICS 238990

1inspections
3citation items
$1,600current penalties
Feb 7, 2017last inspection

OSHA has inspected Big Island Crane Inc once in Hawaii.

The inspection began on Feb 7, 2017, in Kailua Kona.

That inspection ended with 3 citation items: 2 serious and 1 other-than-serious.

Penalties were first proposed at $1,600 and still stand at $1,600.

Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations) comes up most often in these citations: 2 items under 1926.1404.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Big Island Crane Inc averages $1,600 (1 cited inspection).

Big Island Crane Inc: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Hawaii · latest 90 days of OSHA records

63employers cited

Get notified the morning OSHA posts each new citation in Hawaii: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Hawaii

Checking a subcontractor, a client or your own company? Watch Big Island Crane Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342092533 OPENED FEB 7, 2017Closed

Unprogrammed other · Complete · Safety · 1 employee at the site · Closed Apr 25, 2017

78-881 North Pueo Pl, Kailua Kona, HI 96740 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.1404(h)(2) · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)
Serious$1,600$1,600Mar 28, 2017Final
Citation 1, item 1b
29 CFR 1926.1404(q)(2) · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)
Serious$0$0Mar 28, 2017Final
Citation 2, item 1
29 CFR 1926.251(e)(8) · Rigging equipment for material handling
Other-than-serious$0$0Mar 28, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1404 · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)

29 CFR 1926.1404(h)(2)

(2) Blocking material. The size, amount, condition and method of stacking the blocking must be sufficient to sustain the loads and maintain stability.

29 CFR 1926.1404(q)(2)

(2) The outriggers must be set to remove the equipment weight from the wheels, except for locomotive cranes (see paragraph (q)(6) of this section for use of outriggers on locomotive cranes). This provision does not apply to stabilizers.

29 CFR 1926.251 · Rigging equipment for material handling

29 CFR 1926.251(e)(8)

(8) Removal from service. Synthetic web slings shall be immediately removed from service if any of the following conditions are present:

Other all other specialty trade contractors employers in Hawaii

Alert subscribers get notified of each newly cited employer in Hawaii the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.