OSHA SearchOSHA records by employer

Blount Contractors, Inc.: OSHA inspections and violations

Cumberland Gap, Tennessee · Poured Concrete Foundation and Structure Contractors · NAICS 238110

4inspections
6citation items
$1,950current penalties
Mar 19, 2025last inspection

Since 2002, OSHA inspectors have visited Blount Contractors, Inc. in Tennessee 4 times.

The most recent inspection opened on Mar 19, 2025 as a planned inspection, in Sevierville.

In all, OSHA issued 6 citation items: 2 serious and 4 other-than-serious.

The proposed penalties came to $2,600; today they stand at $1,950, 25% less.

The rule cited most here is 1926.1052 (stairways in construction), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Blount Contractors, Inc. averages $0 across 1 cited inspection.

Blount Contractors, Inc.: OSHA citation items per year, 2002 to 2025
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

334employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Blount Contractors, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348118571 OPENED MAR 19, 2025Closed

Planned · Complete · Safety · 7 employees at the site · Closed May 7, 2025

127 Commerce Street, Sevierville, TN 37862 · Other Foundation, Structure, and Building Exterior Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Other-than-serious$0$0Apr 23, 2025Final

Inspection 316389824 OPENED FEB 6, 2012Closed

Planned · Complete · Safety · 6 employees at the site · Closed Jun 7, 2012

2866 Winfield Dunn Parkway, Kodak, TN 37764 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.502(b)(2) · Fall protection systems
Serious$1,600$1,200Mar 29, 2012Closed
Citation 1, item 2
29 CFR 1926.1052(c)(1)(ii) · Stairways in construction
Serious$1,000$750Mar 29, 2012Closed
Citation 2, item 1
29 CFR 1926.1052(b)(1) · Stairways in construction
Other-than-serious$0$0Mar 29, 2012Closed

Inspection 313113862 OPENED MAR 20, 2009Closed

Planned · Complete · Safety · 35 employees at the site · Closed Apr 14, 2009

Phillip Fulmer Way, Knoxville, TN 37996 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Other-than-serious$0$0Apr 8, 2009Closed

Inspection 305597676 OPENED JUN 19, 2002Closed

Planned · Complete · Safety · 8 employees at the site · Closed Jul 29, 2002

661 Old Jacksborough Pike, Cumberland Gap, TN 37724 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(g)(1)(i) · Job-site wiring
Other-than-serious$0$0Jul 19, 2002Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(b)(1)

(1) Except during stairway construction, foot traffic is prohibited on stairways with pan stairs where the treads and/or landings are to be filled in with concrete or other material at a later date, unless the stairs are temporarily fitted with wood or other solid material at least to the top edge of each pan. Such temporary treads and landings shall be replaced when worn below the level of the top edge of the pan.

29 CFR 1926.1052(c)(1)(ii)

(ii) One stairrail system along each unprotected side or edge.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.502 · Fall protection systems

Other poured concrete foundation and structure contractors employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.