Inspection 348385790 OPENED JUL 21, 2025Closed
138 Liberty Street, Bolivar, NY 14715 · Sewage Treatment Facilities · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Bolivar Village WWTP has 3 OSHA inspections on record in New York, the first in 2025.
OSHA's last visit started on Jul 21, 2025 to follow up on an earlier case, in Bolivar.
Across those inspections OSHA issued 7 citation items: 7 serious.
OSHA did not attach a penalty to any of these citations.
Most often, OSHA cited 1910.305, electrical wiring methods (2 items).
For context, across all utility employers the median penalty per cited inspection since 2015 is $0. Bolivar Village WWTP averages $0 over 1 cited inspection in that time.
New York · latest 90 days of OSHA records
362employers cited
4 of them in the same industry
Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in New York
Checking a subcontractor, a client or your own company? Watch Bolivar Village WWTP and get notified the morning OSHA posts a new citation for it.
Watch this company138 Liberty Street, Bolivar, NY 14715 · Sewage Treatment Facilities · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
138 Liberty Street, Bolivar, NY 14715 · Sewage Treatment Facilities · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
138 Liberty Street, Bolivar, NY 14715 · Sewage Treatment Facilities · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.22(d)(2) · Walking-working surfaces |
Serious | $0 | $0 | May 29, 2025 | Final |
| Citation 1, item 2 29 CFR 1910.29(b)(1) · Fall protection systems in general industry |
Serious | $0 | $0 | May 29, 2025 | Final |
| Citation 1, item 3 29 CFR 1910.37(a)(3) · Exit routes |
Serious | $0 | $0 | May 29, 2025 | Final |
| Citation 1, item 4 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $0 | $0 | May 29, 2025 | Final |
| Citation 1, item 5 29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods |
Serious | $0 | $0 | May 29, 2025 | Final |
| Citation 1, item 6 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $0 | $0 | May 29, 2025 | Final |
| Citation 1, item 7 29 CFR 1910.335(a)(1)(i) · Safeguards for personnel protection |
Serious | $0 | $0 | May 29, 2025 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.22(d)(2)
(2) Hazardous conditions on walking-working surfaces are corrected or repaired before an employee uses the walking-working surface again. If the correction or repair cannot be made immediately, the hazard must be guarded to prevent employees from using the walking-working surface until the hazard is corrected or repaired; and
29 CFR 1910.29(b)(1)
(1) The top edge height of top rails, or equivalent guardrail system members, are 42 inches (107 cm), plus or minus 3 inches (8 cm), above the walking-working surface. The top edge height may exceed 45 inches (114 cm), provided the guardrail system meets all other criteria of paragraph (b) of this section (see Figure D-11 of this section).
29 CFR 1910.303(b)(2)
(2) Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.
Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.