Inspection 347468373 OPENED MAY 9, 2024Closed
9340 Virgil H Goode Hwy, Rocky Mount, VA 24151 · Metal Tank (Heavy Gauge) Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Rocky Mount, Virginia · Other Nonhazardous Waste Treatment and Disposal · NAICS 562219
OSHA has inspected Brad's Tank Services 2 times in Virginia since 2023.
The latest one began on May 9, 2024 to follow up on an earlier case, in Rocky Mount.
Those inspections ended with 6 citation items: 3 serious and 3 other-than-serious.
Penalties were first proposed at $6,850 and still stand at $6,850.
Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.
How that compares: the median penalty per cited inspection for staffing, cleaning and waste services employers since 2015 is $2,200, and Brad's Tank Services averages $6,850 (1 cited inspection).
Virginia · latest 90 days of OSHA records
249employers cited
Get notified the morning OSHA posts each new citation in Virginia: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Virginia
Checking a subcontractor, a client or your own company? Watch Brad's Tank Services and get notified the morning OSHA posts a new citation for it.
Watch this company9340 Virgil H Goode Hwy, Rocky Mount, VA 24151 · Metal Tank (Heavy Gauge) Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
9340 Virgil H Goode Hwy, Rocky Mount, VA 24151 · Other Nonhazardous Waste Treatment and Disposal · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements |
Serious | $1,950 | $1,950 | Jan 26, 2024 | Final |
| Citation 1, item 2 29 CFR 1926.451(b)(3) · Scaffolds, general requirements |
Serious | $1,950 | $1,950 | Jan 26, 2024 | Final |
| Citation 1, item 3 29 CFR 1926.451(g)(4) · Scaffolds, general requirements |
Serious | $1,950 | $1,950 | Jan 26, 2024 | Final |
| Citation 2, item 1 29 CFR 1926.50(c) · Medical services and first aid |
Other-than-serious | $0 | $0 | Jan 26, 2024 | Final |
| Citation 2, item 2 29 CFR 1926.451(f)(3) · Scaffolds, general requirements |
Other-than-serious | $0 | $0 | Jan 26, 2024 | Final |
| Citation 2, item 3 29 CFR 16VAC25-60-307.D.1 |
Other-than-serious | $1,000 | $1,000 | Apr 1, 2024 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.451(b)(1)(i)
(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).
29 CFR 1926.451(b)(3)
(3) Except as provided in paragraphs (b)(3) (i) and (ii) of this section, the front edge of all platforms shall not be more than 14 inches (36 cm) from the face of the work, unless guardrail systems are erected along the front edge and/or personal fall arrest systems are used in accordance with paragraph (g) of this section to protect employees from falling.
29 CFR 1926.451(f)(3)
(3) Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.
Alert subscribers get notified of each newly cited employer in Virginia the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.