OSHA SearchOSHA records by employer

Bray Construction LLC: OSHA inspections and violations

Medford, Oregon · Framing Contractors · NAICS 238130

5inspections
13citation items
$4,615current penalties
Apr 26, 2022last inspection

OSHA has inspected Bray Construction LLC 5 times in Oregon since 2014.

The latest one began on Apr 26, 2022 as a planned inspection, in Medford.

Those inspections ended with 13 citation items: 8 serious, 3 repeat and 2 other-than-serious.

Penalties were first proposed at $4,615 and still stand at $4,615.

Stairways in construction comes up most often in these citations: 2 items under 1926.1052.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Bray Construction LLC averages $1,024 (4 cited inspections).

Bray Construction LLC: OSHA citation items per year, 2014 to 2022
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

384employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Bray Construction LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345919385 OPENED APR 26, 2022Closed

Planned · Partial · Safety · 3 employees at the site · Closed Aug 26, 2022

1391 N Phoenix Rd, Medford, OR 97501 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$935$935May 26, 2022Final
Citation 2, item 2
29 CFR OAR 437-003-1501(1)
Repeat$1,875$1,875May 26, 2022Final
Citation 2, item 3
29 CFR OAR 437-003-0503(2)(A)-1
Repeat$200$200May 26, 2022Final

Inspection 345126445 OPENED JAN 29, 2021Closed

Planned · Partial · Safety · 4 employees at the site · Closed Jul 22, 2021

7867 Phaedra Ln, White City, OR 97503 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-0073(2)
Serious$525$525Feb 24, 2021Final
Citation 2, item 2
29 CFR OAR 437-003-0503(2)(A)-1
Other-than-serious$0$0Feb 24, 2021Final

Inspection 342084167 OPENED JAN 30, 2017Closed

Planned · Partial · Safety · 1 employee at the site · Closed Jun 27, 2017

Lot #1437 Creek View Dr, Medford, OR 97504 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-0134(9)(A)
Serious$120$120Mar 16, 2017Final
Citation 1, item 2
29 CFR OAR 437-003-1501(4)
Serious$100$100Mar 16, 2017Final

Inspection 341175164 OPENED JAN 11, 2016Closed

Planned · Complete · Safety · 4 employees at the site · Closed Jul 21, 2016

227 Wysteria, Central Point, OR 97502 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(3)
Serious$100$100Feb 16, 2016Final
Citation 2, item 2
29 CFR 1926.1052(c)(1)(ii) · Stairways in construction
Repeat$240$240Feb 16, 2016Final
Citation 3, item 3
29 CFR OAR 437-003-0503(2)(A)-1
Other-than-serious$0$0Feb 16, 2016Final

Inspection 317532414 OPENED APR 17, 2014Closed

Planned · Partial · Safety · 2 employees at the site · Closed Sep 26, 2014

5183 Pioneer Rd, Medford, OR 97501 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 7031501
Serious$420$420May 16, 2014Closed
Citation 1, item 2a
29 CFR 1926.1052(c)(1)(ii) · Stairways in construction
Serious$100$100May 16, 2014Closed
Citation 1, item 2b
29 CFR 1926.502(b)(2) · Fall protection systems
Serious$0$0May 16, 2014Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(c)(1)(ii)

(ii) One stairrail system along each unprotected side or edge.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.502(b)(2)

(2) Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members shall be installed between the top edge of the guardrail system and the walking/working surface when there is no wall or parapet wall at least 21 inches (53 cm) high.

Other framing contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.