OSHA SearchOSHA records by employer

Brickhouse Restoration: OSHA inspections and violations

Baltimore, Maryland · Masonry Contractors · NAICS 238140

1inspections
5citation items
$472current penalties
May 8, 2017last inspection

Brickhouse Restoration has one OSHA inspection on record in Maryland.

OSHA opened it on May 8, 2017 as a planned inspection, in Baltimore.

From that inspection OSHA issued 5 citation items: 5 serious.

OSHA proposed $749 in penalties. After settlements and reviews the total is $472, down 37%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Brickhouse Restoration averages $472 over 1 cited inspection in that time.

Brickhouse Restoration: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Maryland · latest 90 days of OSHA records

189employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Maryland

Checking a subcontractor, a client or your own company? Watch Brickhouse Restoration and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342308269 OPENED MAY 8, 2017Closed

Planned · Complete · Safety · 3 employees at the site · Closed Dec 11, 2017

3500 Odonnell Street, Baltimore, MD 21224 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.100(a) · Hard hats in construction
Serious$312$197Jul 18, 2017Final
Citation 1, item 1b
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$0$0Jul 18, 2017Final
Citation 1, item 2a
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$437$275Jul 18, 2017Final
Citation 1, item 2b
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Jul 18, 2017Final
Citation 1, item 2c
29 CFR 1926.451(g)(1)(vi) · Scaffolds, general requirements
Serious$0$0Jul 18, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

Other masonry contractors employers in Maryland

Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.