OSHA SearchOSHA records by employer

Builders Firstsource Seg: OSHA inspections and violations

Shelby, Alabama · Fabricated Structural Metal Manufacturing · NAICS 332312

1inspections
6citation items
$14,258current penalties
Dec 12, 2018last inspection

Builders Firstsource Seg has one OSHA inspection on record in Alabama.

OSHA opened it on Dec 12, 2018 as a planned inspection, in Shelby.

From that inspection OSHA issued 6 citation items: 1 serious and 5 other-than-serious.

OSHA proposed $20,368 in penalties. After settlements and reviews the total is $14,258, down 30%.

Most often, OSHA cited 1910.305, electrical wiring methods (2 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Builders Firstsource Seg averages $14,258 over 1 cited inspection in that time.

Builders Firstsource Seg: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Want to know if OSHA cites Builders Firstsource Seg again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 343661542 OPENED DEC 12, 2018Closed

Planned · Complete · Safety · 100 employees at the site · Closed Jun 26, 2019

252 Highway 308, Shelby, AL 35143 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$8,051$5,636May 14, 2019Final
Citation 1, item 2
29 CFR 1910.219(f)(3) · Belts, pulleys and power-transmission parts
Other-than-serious$6,843$4,790May 14, 2019Final
Citation 1, item 3
29 CFR 1910.305(a)(2)(ix) · Electrical wiring methods
Other-than-serious$5,474$3,832May 14, 2019Final
Citation 2, item 1
29 CFR 1910.106(b)(2)(vii)(a) · Flammable liquids
Other-than-serious$0$0May 14, 2019Final
Citation 2, item 2
29 CFR 1910.145(c)(3) · Specifications for accident prevention signs and tags
Other-than-serious$0$0May 14, 2019Final
Citation 2, item 3
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Other-than-serious$0$0May 14, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(b)(2)(vii)(a)

(vi) Vent piping for aboveground tanks. (a) Vent piping shall be constructed in accordance with paragraph (c) of this section.

29 CFR 1910.145 · Specifications for accident prevention signs and tags

29 CFR 1910.145(c)(3)

(3) Safety instruction signs. Safety instruction signs shall be used where there is a need for general instructions and suggestions relative to safety measures.

29 CFR 1910.212 · Machine guarding

29 CFR 1910.212(a)(1)

(a) Machine guarding—(1) Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. Examples of guarding methods are—barrier guards, two-hand tripping devices, electronic safety devices, etc.

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.305 · Electrical wiring methods

Other fabricated structural metal manufacturing employers in Alabama

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.