OSHA SearchOSHA records by employer

C & R Painting Inc: OSHA inspections and violations

Lake Oswego, Oregon · Painting and Wall Covering Contractors · NAICS 238320

4inspections
10citation items
$1,260current penalties
Jan 26, 2017last inspection

OSHA has inspected C & R Painting Inc 4 times in Oregon since 2008.

The latest one began on Jan 26, 2017 as a planned inspection, in Lake Oswego.

Those inspections ended with 10 citation items: 4 serious and 6 other-than-serious.

Penalties were first proposed at $1,260 and still stand at $1,260.

Hazard communication comes up most often in these citations: 3 items under 1926.59.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and C & R Painting Inc averages $630 (1 cited inspection).

C & R Painting Inc: OSHA citation items per year, 2008 to 2017
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

385employers cited

9 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch C & R Painting Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342067360 OPENED JAN 26, 2017Closed

Planned · Partial · Safety · 4 employees at the site · Closed Jun 27, 2017

3890 Upper Dr, Lake Oswego, OR 97035 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Serious$630$630Mar 20, 2017Final
Citation 2, item 2
29 CFR OAR 437-001-0765(13)-1
Other-than-serious$0$0Mar 20, 2017Final

Inspection 312299498 OPENED JUL 25, 2008Closed

Referral · Partial · Health · 3 employees at the site · Closed Dec 31, 2008

Sw Gaarde & Greenfield Maplecrest Lot 2, Tigard, OR 97223 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.59(g)(8) · Hazard communication
Other-than-serious$0$0Sep 8, 2008Closed
Citation 1, item 2
29 CFR 1926.59(h)(1) · Hazard communication
Other-than-serious$0$0Sep 8, 2008Closed
Citation 1, item 3
29 CFR 1926.103(k)(6) · Respiratory protection
Other-than-serious$0$0Sep 8, 2008Closed

Inspection 312298441 OPENED JUL 1, 2008Closed

Referral · Partial · Health · 3 employees at the site · Closed Jan 5, 2009

5364 Langford Ln, Lake Oswego, OR 97035 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.59(e)(1) · Hazard communication
Other-than-serious$0$0Sep 8, 2008Closed

Inspection 311699656 OPENED APR 30, 2008Closed

Planned · Complete · Safety · 18 employees at the site · Closed Nov 19, 2008

5364 Langford Ln, Lake Oswego, OR 97035 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(d) · Job-site wiring
Serious$100$100Jul 1, 2008Closed
Citation 1, item 2
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$165$165Jul 1, 2008Closed
Citation 1, item 3 Serious$165$165Jul 1, 2008Closed
Citation 2, item 4 Other-than-serious$200$200Jul 1, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.103 · Respiratory protection

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

29 CFR 1926.405(d)

(d) Switchboards and panelboards. Switchboards that have any exposed live parts shall be located in permanently dry locations and accessible only to qualified persons. Panelboards shall be mounted in cabinets, cutout boxes, or enclosures designed for the purpose and shall be dead front. However, panelboards other than the dead front externally-operable type are permitted where accessible only to qualified persons. Exposed blades of knife switches shall be dead when open.

29 CFR 1926.59 · Hazard communication

29 CFR 7010.7650

29 CFR 7030.5030

Other painting and wall covering contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.