OSHA SearchOSHA records by employer

Camor Plastering, Inc.: OSHA inspections and violations

Oakland Park, Florida · Drywall and Insulation Contractors · NAICS 238310

1inspections
6citation items
$4,500current penalties
Apr 5, 2017last inspection

OSHA inspectors have visited Camor Plastering, Inc. in Florida one time.

It opened on Apr 5, 2017 as a planned inspection, in Oakland Park.

In all, OSHA issued 6 citation items: 4 serious and 2 other-than-serious.

The proposed penalties came to $8,996; today they stand at $4,500, 50% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Camor Plastering, Inc. averages $4,500 across 1 cited inspection.

Camor Plastering, Inc.: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

338employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Camor Plastering, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342226297 OPENED APR 5, 2017Closed

Planned · Partial · Safety · 6 employees at the site · Closed Feb 12, 2019

4100 N. Dixie Hwy Building #11, Townhomes #89-92, Oakland Park, FL 33334 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$3,259$1,631Apr 17, 2017Final
Citation 1, item 1b
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Apr 17, 2017Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,716$1,358Apr 17, 2017Final
Citation 1, item 3
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,716$1,358Apr 17, 2017Final
Citation 2, item 1
29 CFR 1926.95(a) · Criteria for personal protective equipment
Other-than-serious$305$153Apr 17, 2017Final
Citation 2, item 2
29 CFR 1926.451(h)(2)(ii) · Scaffolds, general requirements
Other-than-serious$0$0Apr 17, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

29 CFR 1926.454 · Scaffold training

29 CFR 1926.95 · Criteria for personal protective equipment

Other drywall and insulation contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.