OSHA SearchOSHA records by employer

Carteret Septic Tank - Construction, Inc.: OSHA inspections and violations

Pine Knoll Shores, North Carolina · Site Preparation Contractors · NAICS 238910

1inspections
2citation items
$9,678current penalties
Nov 5, 2024last inspection

OSHA has inspected Carteret Septic Tank - Construction, Inc. once in North Carolina.

The inspection began on Nov 5, 2024 after a fatality or catastrophe, in Pine Knoll Shores.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $8,065 and still stand at $9,678.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Carteret Septic Tank - Construction, Inc. averages $9,678 (1 cited inspection).

1 inspection on this page followed a fatal incident.

Carteret Septic Tank - Construction, Inc.: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

228employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Carteret Septic Tank - Construction, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347867533 OPENED NOV 5, 2024Closed

Fatality or catastrophe · Partial · Health · 5 employees at the site · Closed Sep 12, 2025

136 Bayview Blvd., Pine Knoll Shores, NC 28512 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Incident on Nov 5, 2024 (fatal): Employee is struck by falling concrete block wall during dem

At 11:08 a.m. on November 5, 2024, Employee #1 was working at the site of a one-story residential structure being demolished with a trackhoe. The building was constructed of concrete block. During demolition, a portion of the block wall collapsed and struck him. He sustained fatal injuries.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.850(a) · Preparatory operations
Serious$3,226$4,839Feb 21, 2025Final
Citation 1, item 3
29 CFR 1926.859(a) · Mechanical demolition
Serious$4,839$4,839Feb 21, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.850 · Preparatory operations

29 CFR 1926.850(a)

(a) Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed.

29 CFR 1926.859 · Mechanical demolition

29 CFR 1926.859(a)

(a) No workers shall be permitted in any area, which can be adversely affected by demolition operations, when balling or clamming is being performed. Only those workers necessary for the performance of the operations shall be permitted in this area at any other time.

Other site preparation contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.