OSHA SearchOSHA records by employer

Cascade Composites LLC: OSHA inspections and violations

Eugene, Oregon · Other Aircraft Parts and Auxiliary Equipment Manufacturing · NAICS 336413

3inspections
7citation items
$500current penalties
Aug 18, 2026last inspection

OSHA has inspected Cascade Composites LLC 3 times in Oregon since 2013.

The latest one began on Aug 18, 2026 as a planned inspection, in Eugene; the case is still open.

Those inspections ended with 7 citation items: 5 serious and 2 other-than-serious.

Penalties were first proposed at $500 and still stand at $500.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Cascade Composites LLC averages $0 (1 cited inspection).

Cascade Composites LLC also files yearly injury logs with OSHA, summarized below.

Cascade Composites LLC: OSHA citation items per year, 2013 to 2026
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

384employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Cascade Composites LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349119842 OPENED AUG 18, 2026Open

Planned · Complete · Safety · 9 employees at the site · Open

2301 Nugget Way, Eugene, OR 97403 · Other Aircraft Parts and Auxiliary Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.242(b) · Hand and power tools
Other-than-serious$0$0Sep 25, 2026Final

Inspection 345973523 OPENED MAY 20, 2022Closed

Planned · Complete · Safety · 6 employees at the site · Closed Jun 10, 2022

2301 Nugget Way, Eugene, OR 97403 · Other Aircraft Parts and Auxiliary Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 316949528 OPENED SEP 25, 2013Closed

Planned · Complete · Safety · 5 employees at the site · Closed Apr 2, 2014

2290 Nugget Way, Eugene, OR 97403 · Other Aircraft Parts and Auxiliary Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.219(c)(2)(i) · Belts, pulleys and power-transmission parts
Serious$100$100Nov 13, 2013Closed
Citation 1, item 2
29 CFR 1910.215(a)(2) · Grinders and abrasive wheels
Serious$100$100Nov 13, 2013Closed
Citation 1, item 3 Serious$100$100Nov 13, 2013Closed
Citation 1, item 4
29 CFR 1910.213(i)(1) · Woodworking machinery
Serious$100$100Nov 13, 2013Closed
Citation 1, item 5
29 CFR 1910.304(b)(3)(i) · Grounding and circuit protection
Serious$100$100Nov 13, 2013Closed
Citation 2, item 6 Other-than-serious$0$0Nov 13, 2013Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Eugene site logged 1 recordable injury or illness among about 9 workers: 13.6 per 100 full-time workers, against a median of 1.1 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Cascade Composites LLC
Eugene · 2025
9 1013.61.1

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.213(i)(1)

(i) Bandsaws and band resaws. (1) All portions of the saw blade shall be enclosed or guarded, except for the working portion of the blade between the bottom of the guide rolls and the table. Bandsaw wheels shall be fully encased. The outside periphery of the enclosure shall be solid. The front and back of the band wheels shall be either enclosed by solid material or by wire mesh or perforated metal. Such mesh or perforated metal shall be not less than 0.037 inch (U.S. Gage No. 20), and the openings shall be not greater than three-eighths inch. Solid material used for this purpose shall be of an equivalent strength and firmness. The guard for the portion of the blade between the sliding guide and the upper-saw-wheel guard shall protect the saw blade at the front and outer side. This portion of the guard shall be self-adjusting to raise and lower with the guide. The upper-wheel guard shall

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.215(a)(2)

(2) Guard design. The safety guard shall cover the spindle end, nut, and flange projections. The safety guard shall be mounted so as to maintain proper alignment with the wheel, and the strength of the fastenings shall exceed the strength of the guard, except:

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.219(c)(2)(i)

(2) Guarding horizontal shafting. (i) All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform, excepting runways used exclusively for oiling, or running adjustments, shall be protected by a stationary casing enclosing shafting completely or by a trough enclosing sides and top or sides and bottom of shafting as location requires.

29 CFR 1910.242 · Hand and power tools

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 7020.1870

29 CFR 7020.2270

Other other aircraft parts and auxiliary equipment manufacturing employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.