OSHA SearchOSHA records by employer

Cascade SD 5: OSHA inspections and violations

Turner, Oregon · Elementary and Secondary Schools · NAICS 611110

3inspections
14citation items
$1,620current penalties
Jan 2, 2020last inspection

Since 1999, OSHA inspectors have visited Cascade SD 5 in Oregon 3 times.

The most recent inspection opened on Jan 2, 2020 as a planned inspection, in Turner.

In all, OSHA issued 14 citation items: 4 serious and 10 other-than-serious.

The penalties, $1,620 in total, stand where OSHA first set them.

The rule cited most here is 1910.132 (personal protective equipment, general requirements), 2 times.

Among education employers, the typical cited inspection since 2015 ends with a $0 penalty. Cascade SD 5 averages $1,200 across 1 cited inspection.

Cascade SD 5: OSHA citation items per year, 1999 to 2020
Citation items per year, by inspection date.

Want to know if OSHA cites Cascade SD 5 again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 344618517 OPENED JAN 2, 2020Closed

Planned · Partial · Safety · Local government · 2 employees at the site · Closed Jun 25, 2020

7800 School St Se, Turner, OR 97392 · Elementary and Secondary Schools · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR OAR 437-003-1501(1)
Serious$1,200$1,200Mar 5, 2020Final
Citation 1, item 1b
29 CFR OAR 437-003-1501(3)-2
Serious$0$0Mar 5, 2020Final

Inspection 312713068 OPENED JAN 29, 2009Closed

Planned · Complete · Safety · Local government · 70 employees at the site · Closed May 27, 2009

10226 Marion Rd Se, Turner, OR 97392 · Elementary and Secondary Schools · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Other-than-serious$0$0Feb 17, 2009Closed
Citation 1, item 2
29 CFR 1910.132(f)(4) · Personal protective equipment, general requirements
Other-than-serious$0$0Feb 17, 2009Closed
Citation 1, item 3
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0Feb 17, 2009Closed

Inspection 302054960 OPENED MAR 1, 1999Closed

Planned · Complete · Safety · Local government · 130 employees at the site · Closed Sep 24, 1999

10226 Marion Rd Se, Turner, OR 97392 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 4250003 A
Serious$210$210Apr 2, 1999Closed
Citation 1, item 2
29 CFR 1910.215(a)(2) · Grinders and abrasive wheels
Serious$210$210Apr 2, 1999Closed
Citation 2, item 3
29 CFR 1910.305(b)(2) · Electrical wiring methods
Other-than-serious$0$0Apr 2, 1999Closed
Citation 2, item 4
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Other-than-serious$0$0Apr 2, 1999Closed
Citation 2, item 5
29 CFR 1910.176(c) · Material storage and aisles
Other-than-serious$0$0Apr 2, 1999Closed
Citation 2, item 6 Other-than-serious$0$0Apr 2, 1999Closed
Citation 2, item 7
29 CFR 1910.134(c)(1) · Respiratory protection
Other-than-serious$0$0Apr 2, 1999Closed
Citation 2, item 8
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Other-than-serious$0$0Apr 2, 1999Closed
Citation 2, item 9
29 CFR 1910.1200(f)(5)(ii) · Hazard communication
Other-than-serious$0$0Apr 2, 1999Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(f)(5)(ii)

(ii) The label for bulk shipments of hazardous chemicals must be on the immediate container, transmitted with the shipping papers or the bills of lading, or, with the agreement of the receiving entity, transmitted by technological or electronic means so that it is immediately available to workers in printed form on the receiving end of shipment.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.132(d)(2)

(2) The employer shall verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated; the person certifying that the evaluation has been performed; the date(s) of the hazard assessment; and, which identifies the document as a certification of hazard assessment.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(c)(1)

(1) The test instrument must have an effective audio-warning device, or a visual-warning device in the form of a screen tracing, that indicates when the test subject fails to hold his or her breath during the test. The test must be terminated and restarted from the beginning when the test subject fails to hold his or her breath during the test. The test subject then may be refitted and retested.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.176 · Material storage and aisles

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 7010.7600

Other elementary and secondary schools employers in Oregon

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.