OSHA SearchOSHA records by employer

CE Construction: OSHA inspections and violations

Montgomery, Alabama · Masonry Contractors · NAICS 238140

1inspections
5citation items
$8,000current penalties
Apr 22, 2015last inspection

OSHA inspectors have visited CE Construction in Alabama one time.

It opened on Apr 22, 2015 as a planned inspection, in Montgomery.

In all, OSHA issued 5 citation items: 5 serious.

The penalties, $8,000 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. CE Construction averages $8,000 across 1 cited inspection.

CE Construction: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites CE Construction again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 340574094 OPENED APR 22, 2015Closed

Planned · Partial · Safety · 3 employees at the site · Closed Nov 5, 2018

1601 Eastern Blvd., Montgomery, AL 36108 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,600$1,600Jun 23, 2015Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,600$1,600Jun 23, 2015Final
Citation 1, item 3
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$1,600$1,600Jun 23, 2015Final
Citation 1, item 4
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$1,600$1,600Jun 23, 2015Final
Citation 1, item 5
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$1,600$1,600Jun 23, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

Other masonry contractors employers in Alabama

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.