Centurion Stone: OSHA inspections and violations

Columbia, Missouri · Masonry Contractors · NAICS 238140

1inspections
5citation items
$6,820current penalties
Jun 12, 2019last inspection

OSHA inspectors have visited Centurion Stone in Missouri one time.

It opened on Jun 12, 2019 as a planned inspection, in Columbia.

In all, OSHA issued 5 citation items: 5 serious.

The proposed penalties came to $13,071; today they stand at $6,820, 48% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. Centurion Stone averages $6,820 across 1 cited inspection.

Centurion Stone: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Want to know if OSHA cites Centurion Stone again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 344079116 OPENED JUN 12, 2019Closed

Planned · Complete · Safety · 2 employees at the site · Closed May 20, 2021

4103 W. Vawter School Rd, Columbia, MO 65201 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$2,273$1,705Sep 24, 2019Final
Citation 1, item 1b
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$0$0Sep 24, 2019Final
Citation 1, item 2a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$3,978$2,984Sep 24, 2019Final
Citation 1, item 2b
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$3,978$0Sep 24, 2019Final
Citation 1, item 3
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$2,842$2,132Sep 24, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: