Cersosimo Lumber Company, Inc. has 15 OSHA inspections on record in Vermont, the first in 1973.
OSHA's last visit started on Dec 5, 2022 after a fatality or catastrophe, in Brattleboro.
Across those inspections OSHA issued 70 citation items: 26 serious, 1 willful, 2 repeat and 41 other-than-serious.
OSHA proposed $238,127 in penalties. After settlements and reviews the total is $140,229, down 41%.
Most often, OSHA cited 1910.305, electrical wiring methods (10 items).
For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Cersosimo Lumber Company, Inc. averages $22,180 over 6 cited inspections in that time.
Cersosimo Lumber Company, Inc. also files yearly injury logs with OSHA, summarized below.
Citation items per year, by inspection date.
Vermont · latest 90 days of OSHA records
27employers cited
Get notified the morning OSHA posts each new citation in Vermont: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch Cersosimo Lumber Company, Inc. and get notified the morning OSHA posts a new citation for it.
OSHA records show Cersosimo Lumber Company, Inc. at 4 sites in 3 states. Together they've had 17 inspections and $144,093 in current penalties.
We match records by employer name and industry, so these sites are likely the same company, not certainly. Franchises and subsidiaries can file under one name.
Included with any plan: the site-by-site record for all 4 sites, with repeat and willful violations and citations per year for the whole company. Already a subscriber? Sign in.
Incident on Apr 7, 2020: Employee incurs multiple injuries when caught between stacke
At 4:46 p.m. on April 7, 2020, an employee was working as a machine operator at a sawmill. He was working in the facility's Mill # 1 lumber stacking area. Employees there worked near a stacker. It was a piece of machinery equipped with forks. It took boards up to 16 feet (4.9 meters) in length and assembled them into lumber packs approximately 76 inches (6 feet, 4 inches; or 1.9 meters) tall, measured from the floor. The boards were set on sticks as the stacks were built. As employees built the packs, they were exposed to displaced boards that could strike them. They were also exposed to the forks of the stacker as it lowered the boards to set them on the sticks. At the time of the incident, the employee was between some stacks. He was resetting a stick in a lumber pack, he was struck by the stacker and pinched between the stacker and the lumber pack. The employee received crushing injuries to his lower torso. He also suffered a broken vertebra, bruising of his internal organs, a broken pelvis, and a ruptured bladder. He was hospitalized.
Incident on Dec 17, 2018: Employee's foot is crushed and amputated in chain sprocket
At 12:00 p.m. on December 17, 2018, Employee #1 was attempting to clear a cant jam on the chain table. He inadvertently stepped onto a moving chain, which pulled his foot into the chain sprocket. His left foot was crushed, resulting in amputation. Employee #1 was hospitalized for treatment.
Incident on Feb 8, 2018: Employee catches finger under cant and amputates fingertip
At 6:30 p.m. on February 8, 2018, an employee was feeding cants into the Re-saw when one of the carts slid off of the feed table. The employee was putting the cant back on the feed table and caught his left hand's middle finger underneath the cant, crushing the tip of it. The employee amputated his fingertip. Hospitalization was not required.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the Brattleboro site logged 25 recordable injuries or illnesses among about 135 workers: 17.8 per 100 full-time workers, against a median of 4.6 for its industry. Those cases cost 234 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Cersosimo Lumber Company
Brattleboro · 2025
135
25
4
17.8
4.6
Cersosimo Lumber Company, Inc.
Brattleboro · 2023
175
3
0
0.0
4.2
CLC Brattleboro
Brattleboro · 2016
180
27
13
13.4
4.2
Included with any plan: 4 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.
29 CFR 1910.132 · Personal protective equipment, general requirements
29 CFR 1910.132(d)(1)
(d) Hazard assessment and equipment selection. (1) The employer shall assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE). If such hazards are present, or likely to be present, the employer shall:
(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.
Alert subscribers get notified of each newly cited employer in Vermont the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.