OSHA SearchOSHA records by employer

Chad A. Gray: OSHA inspections and violations

Eastport, Maine · Siding Contractors · NAICS 238170

1inspections
2citation items
$2,084current penalties
Jan 6, 2021last inspection

OSHA has inspected Chad A. Gray once in Maine.

The inspection began on Jan 6, 2021 after a complaint, in Eastport.

That inspection ended with 2 citation items: 1 serious and 1 other-than-serious.

Penalties were first proposed at $2,084 and still stand at $2,084.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Chad A. Gray averages $2,084 (1 cited inspection).

Chad A. Gray: OSHA citation items per year, 2021 to 2021
Citation items per year, by inspection date.

Want to know if OSHA cites Chad A. Gray again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 345088645 OPENED JAN 6, 2021Closed

Complaint · Partial · Safety · 1 employee at the site · Closed Sep 29, 2023

27 Washington Street, Eastport, ME 04631 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$1,755$1,755Feb 23, 2021Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$329$329Jul 13, 2021Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other siding contractors employers in Maine

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.