OSHA SearchOSHA records by employer

Chris Camp LLC: OSHA inspections and violations

Sea Island, Georgia · Masonry Contractors · NAICS 238140

2inspections
6citation items
$6,469current penalties
May 20, 2019last inspection

Chris Camp LLC has 2 OSHA inspections on record in Georgia, the first in 2016.

OSHA's last visit started on May 20, 2019 as a planned inspection, in Saint Simons Island.

Across those inspections OSHA issued 6 citation items: 4 serious and 2 other-than-serious.

OSHA proposed $9,929 in penalties. After settlements and reviews the total is $6,469, down 35%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Chris Camp LLC averages $3,234 over 2 cited inspections in that time.

Chris Camp LLC: OSHA citation items per year, 2016 to 2019
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

146employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Chris Camp LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344022967 OPENED MAY 20, 2019Closed

Planned · Complete · Safety · 6 employees at the site · Closed Jul 16, 2019

194 Olive Drive, Saint Simons Island, GA 31522 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$1,705$1,279May 24, 2019Final
Citation 1, item 2
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$1,705$1,279May 24, 2019Final
Citation 2, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0May 24, 2019Final
Citation 2, item 1b
29 CFR 1910.1200(h)(1) · Hazard communication
Other-than-serious$0$0May 24, 2019Final

Inspection 341907525 OPENED NOV 9, 2016Closed

Planned · Partial · Safety · 3 employees at the site · Closed Aug 16, 2017

106 F 25th St, Sea Island, GA 31561 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$3,803$2,282Feb 3, 2017Final
Citation 1, item 2
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$2,716$1,630Feb 3, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(h)(1)

(h) Employee information and training. (1) Employers shall provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. Information and training may be designed to cover categories of hazards (e.g., flammability, carcinogenicity) or specific chemicals. Chemical-specific information must always be available through labels and safety data sheets.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

29 CFR 1926.452 · Rules for each type of scaffold

Other masonry contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.