OSHA SearchOSHA records by employer

Cie USA dba Century Plastics LLC: OSHA inspections and violations

Shelby Township, Michigan · All Other Plastics Product Manufacturing · NAICS 326199

5inspections
8citation items
$6,300current penalties
Aug 1, 2023last inspection

OSHA has inspected Cie USA dba Century Plastics LLC 5 times in Michigan since 2021.

The latest one began on Aug 1, 2023 on a referral, in Macomb.

Those inspections ended with 8 citation items: 6 serious and 2 other-than-serious.

Penalties were first proposed at $12,600 and now stand at $6,300, 50% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 2 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Cie USA dba Century Plastics LLC averages $3,150 (2 cited inspections).

Cie USA dba Century Plastics LLC: OSHA citation items per year, 2021 to 2023
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

621employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Cie USA dba Century Plastics LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346874555 OPENED AUG 1, 2023Closed

Referral · Partial · Safety · 180 employees at the site · Closed Nov 8, 2023

51258 Quadrate Drive, Macomb, MI 48042 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.303(b)(7) · Electrical equipment, general requirements
Other-than-serious$0$0Oct 13, 2023Final
Citation 1, item 1b
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Other-than-serious$0$0Oct 13, 2023Final

Inspection 346780901 OPENED JUN 21, 2023Closed

Complaint · Partial · Health · 167 employees at the site · Closed Aug 8, 2023

50570 Birch Drive, Shelby Township, MI 48315 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 346614548 OPENED APR 6, 2023Closed

Referral · Partial · Safety · 142 employees at the site · Closed May 2, 2023

50787 Utica Dr, Shelby Township, MI 48315 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345944672 OPENED MAY 9, 2022Closed

Complaint · Partial · Safety · 300 employees at the site · Closed Jun 15, 2022

15030 23 Mile Rd, Shelby Township, MI 48315 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345354187 OPENED JUN 10, 2021Closed

Referral · Partial · Safety · 256 employees at the site · Closed Sep 2, 2021

51102 Quadrate Dr, Shelby Township, MI 48315 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on May 29, 2021: Employee lacerates arm when pulled into belt conveyor end ro

At 2:35 p.m. on May 29, 2021, an employee working as a machine operator for a plastics manufacturer was cleaning the glue from a white belt conveyor on the 3053 glue roller. The employee placed his right hand between the belt underneath the conveyor to clean glue buildup while the conveyor was running. The employee caught his hand and his arm was drawn into the idler end roller. The employee was hospitalized to treat a 4-inch-wide laceration that extended from wrist to elbow.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 408.11412(3)
Serious$6,300$3,150Jul 23, 2021Final
Citation 1, item 1b
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0Jul 23, 2021Final
Citation 1, item 1c
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$0$0Jul 23, 2021Final
Citation 1, item 2a
29 CFR 408.11442(2)
Serious$6,300$3,150Jul 23, 2021Final
Citation 1, item 2b
29 CFR 408.11411(1)
Serious$0$0Jul 23, 2021Final
Citation 1, item 2c
29 CFR 408.11411(2)
Serious$0$0Jul 23, 2021Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(7)(i)

(7) Training and communication. (i) The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. The training shall include the following:

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(7)

(7) Mechanical execution of work. Electric equipment shall be installed in a neat and workmanlike manner.

29 CFR 1910.305 · Electrical wiring methods

Other all other plastics product manufacturing employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.