OSHA SearchOSHA records by employer

CJ Rack Installation, Inc.: OSHA inspections and violations

Fort Worth, Texas · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

1inspections
2citation items
$2,387current penalties
Feb 3, 2021last inspection

CJ Rack Installation, Inc. has one OSHA inspection on record in Texas.

OSHA opened it on Feb 3, 2021 after a complaint, in Fort Worth.

From that inspection OSHA issued 2 citation items: 2 serious.

OSHA proposed $3,978 in penalties. After settlements and reviews the total is $2,387, down 40%.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. CJ Rack Installation, Inc. averages $2,387 over 1 cited inspection in that time.

CJ Rack Installation, Inc.: OSHA citation items per year, 2021 to 2021
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

394employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch CJ Rack Installation, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345136899 OPENED FEB 3, 2021Closed

Complaint · Partial · Safety · 17 employees at the site · Closed Mar 24, 2021

1511 Ne Loop 820, Fort Worth, TX 76131 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(a)(1) · Scaffolds, general requirements
Serious$1,989$1,193Mar 5, 2021Final
Citation 1, item 2
29 CFR 1926.602(c)(1)(vi) · Earthmovers and forklifts in construction
Serious$1,989$1,193Mar 5, 2021Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(1)

(a) Capacity. (1) Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.

29 CFR 1926.602 · Earthmovers and forklifts in construction

29 CFR 1926.602(c)(1)(vi)

(c) Lifting and hauling equipment (other than equipment covered under subpart N of this part). (1) Industrial trucks shall meet the requirements of § 1926.600 and the following:

Other electrical contractors and other wiring installation contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.