Cladding Systems, Inc: OSHA inspections and violations

Orlando, Florida · Drywall and Insulation Contractors · NAICS 238310

3inspections
10citation items
$2,126current penalties
May 10, 2016last inspection

Since 2003, OSHA inspectors have visited Cladding Systems, Inc in Florida 3 times.

The most recent inspection opened on May 10, 2016 as a planned inspection, in Tampa.

In all, OSHA issued 10 citation items: 7 serious and 3 other-than-serious.

The proposed penalties came to $3,075; today they stand at $2,126, 31% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 7 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. Cladding Systems, Inc averages $720 across 1 cited inspection.

The Wage and Hour Division has 1 case on it since 2015, with $0 in back wages owed to workers.

Cladding Systems, Inc: OSHA citation items per year, 2003 to 2016
Citation items per year, by inspection date.

Want to know if OSHA cites Cladding Systems, Inc again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 341460400 OPENED MAY 10, 2016Closed

Planned · Complete · Safety · 16 employees at the site · Closed May 31, 2016

3218 East 4th Avenue, Tampa, FL 33605 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$1,200$720May 16, 2016Final

Inspection 308577998 OPENED FEB 24, 2005Closed

Planned · Partial · Safety · 5 employees at the site · Closed Mar 15, 2005

917 Hughey Avenue, Orlando, FL 32806 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$375$281Mar 7, 2005Closed
Citation 1, item 1b
29 CFR 1926.451(f)(4) · Scaffolds, general requirements
Serious$0$0Mar 7, 2005Closed
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$375$281Mar 7, 2005Closed
Citation 1, item 3
29 CFR 1926.451(f)(6) · Scaffolds, general requirements
Serious$375$281Mar 7, 2005Closed
Citation 1, item 4
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$375$281Mar 7, 2005Closed
Citation 2, item 1
29 CFR 1926.451(b)(10) · Scaffolds, general requirements
Other-than-serious$0$0Mar 7, 2005Closed
Citation 2, item 2
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Other-than-serious$0$0Mar 7, 2005Closed
Citation 2, item 3
29 CFR 1926.452(c)(3) · Rules for each type of scaffold
Other-than-serious$0$0Mar 7, 2005Closed

Inspection 306408139 OPENED FEB 27, 2003Closed

Planned · Partial · Safety · 15 employees at the site · Closed Jul 1, 2003

4134 Bear Rd., Orlando, FL 32827 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$375$281Jun 20, 2003Closed

Wage and hour cases

Cases by the Labor Department's Wage and Hour Division since 2015: unpaid minimum wage or overtime, child labor, family leave and more.

Period reviewedViolationsWorkers owedBack wagesPenalties
Feb 22, 2015 to Feb 19, 2017
Tampa
10$0$0

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(1)

(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(b)(10)

(10) Scaffold components manufactured by different manufacturers shall not be intermixed unless the components fit together without force and the scaffold's structural integrity is maintained by the user. Scaffold components manufactured by different manufacturers shall not be modified in order to intermix them unless a competent person determines the resulting scaffold is structurally sound.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.453 · Aerial lifts

Other drywall and insulation contractors employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.