OSHA SearchOSHA records by employer

Clear Span Structures, LLC: OSHA inspections and violations

Doral, Florida · Commercial and Institutional Building Construction · NAICS 236220

1inspections
2citation items
$6,452current penalties
Apr 2, 2024last inspection

Clear Span Structures, LLC has one OSHA inspection on record in Florida.

OSHA opened it on Apr 2, 2024 as part of a related case, in Doral.

From that inspection OSHA issued 2 citation items: 2 serious.

OSHA proposed $6,452 in penalties and the amount has not been reduced.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,078. Clear Span Structures, LLC averages $6,452 over 1 cited inspection in that time.

Clear Span Structures, LLC: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites Clear Span Structures, LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347387433 OPENED APR 2, 2024Closed

Unprogrammed related · Partial · Safety · 1 employee at the site · Closed Apr 30, 2025

Street Address 1: 10055 Nw 12th Street, Doral, FL 33172 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.850(c) · Preparatory operations
Serious$6,452$6,452Sep 18, 2024Final
Citation 1, item 1b
29 CFR 1926.417(b) · Lockout and tagging of circuits
Serious$0$0Sep 18, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.417 · Lockout and tagging of circuits

29 CFR 1926.417(b)

(b) Equipment and circuits. Equipment or circuits that are deenergized shall be rendered inoperative and shall have tags attached at all points where such equipment or circuits can be energized.

29 CFR 1926.850 · Preparatory operations

29 CFR 1926.850(c)

(c) All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line before demolition work is started. In each case, any utility company which is involved shall be notified in advance.

Other commercial and institutional building construction employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.