OSHA SearchOSHA records by employer

Colossus Contracting Group LLC: OSHA inspections and violations

Wesley Chapel, Florida · Framing Contractors · NAICS 238130

8inspections
16citation items
$711,343current penalties
Jun 26, 2025last inspection

OSHA has inspected Colossus Contracting Group LLC 8 times in Florida since 2025.

The latest one began on Jun 26, 2025 on a referral, in Parrish; the case is still open.

Those inspections ended with 16 citation items: 6 serious, 6 willful, 2 repeat and 2 other-than-serious.

Penalties were first proposed at $711,343 and still stand at $711,343.

Fall protection in construction comes up most often in these citations: 7 items under 1926.501.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Colossus Contracting Group LLC averages $88,918 (8 cited inspections).

Colossus Contracting Group LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

333employers cited

42 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Colossus Contracting Group LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348327016 OPENED JUN 26, 2025Open

Referral · Partial · Safety · 35 employees at the site · Open

1762 Cobb Trail, Parrish, FL 34219 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Willful$165,514$165,514Nov 25, 2025Final
Citation 2, item 1
29 CFR 1926.503(a)(1) · Fall protection training in construction
Repeat$39,720$39,720Nov 25, 2025Final
Citation 3, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$1,594$1,594Mar 26, 2026Final
Citation 3, item 2
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$1,594$1,594Mar 26, 2026Final

Inspection 348257361 OPENED MAY 20, 2025Closed

Planned · Partial · Safety · 6 employees at the site · Closed Jul 28, 2025

54 Overleaf Ln, Orlando, FL 32839 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$4,729$4,729Jun 25, 2025Final
Citation 2, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Repeat$13,240$13,240Jun 25, 2025Final

Inspection 348253055 OPENED MAY 14, 2025Closed

Planned · Partial · Safety · 35 employees at the site · Closed Oct 20, 2026

9746 Autumn Ridge, Riverview, FL 33578 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Willful$109,239$109,239Jun 18, 2025Final

Inspection 348202961 OPENED APR 24, 2025Open

Planned · Partial · Safety · 6 employees at the site · Open

28804 Jujube Rd, Wesley Chapel, FL 33543 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Willful$91,033$91,033Jul 11, 2025Final
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Willful$91,033$91,033Jul 11, 2025Final

Inspection 348159773 OPENED APR 4, 2025Open

Complaint · Partial · Safety · 3 employees at the site · Open

1452 Powell Valley Drive, Port Charlotte, FL 33953 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Willful$82,757$82,757Sep 11, 2025Final
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Willful$70,933$70,933Sep 11, 2025Final

Inspection 348111006 OPENED MAR 14, 2025Closed

Referral · Partial · Safety · 3 employees at the site · Closed Jul 2, 2025

1647 Valier Point, Zephyrhills, FL 33541 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$11,585$11,585Apr 22, 2025Final
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$11,585$11,585Apr 22, 2025Final

Inspection 348087099 OPENED MAR 6, 2025Closed

Complaint · Partial · Safety · 5 employees at the site · Closed Jul 2, 2025

32431 Osprey Peak Way, Wesley Chapel, FL 33545 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$6,620$6,620Apr 22, 2025Final
Citation 1, item 2
29 CFR 1926.1053(b)(4) · Ladders in construction
Serious$6,620$6,620Apr 22, 2025Final

Inspection 348043167 OPENED FEB 13, 2025Closed

Planned · Partial · Safety · 6 employees at the site · Closed Jul 28, 2025

15125 Grove Lake Dr, Winter Garden, FL 34787 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$3,547$3,547May 9, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.453 · Aerial lifts

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

Other framing contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.