Inspection 349210773 OPENED OCT 8, 2026Open
362 Turnpike St, Canton, MA 02021 · Industrial Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
Beverly, Massachusetts · Commercial and Institutional Building Construction · NAICS 236220
Connolly Brothers, Inc. has 12 OSHA inspections on record in Massachusetts, the first in 1991.
OSHA's last visit started on Oct 8, 2026 as a planned inspection, in Canton, and the case has not closed yet.
Across those inspections OSHA issued 15 citation items: 15 serious.
OSHA proposed $32,917 in penalties. After settlements and reviews the total is $17,259, down 48%.
Most often, OSHA cited 1926.502, fall protection systems (4 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Connolly Brothers, Inc. averages $5,646 over 1 cited inspection in that time.
Massachusetts · latest 90 days of OSHA records
256employers cited
5 of them in the same industry
Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Massachusetts
Checking a subcontractor, a client or your own company? Watch Connolly Brothers, Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company362 Turnpike St, Canton, MA 02021 · Industrial Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
626 Lynnway, Lynn, MA 01905 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.850(c) · Preparatory operations |
Serious | $11,292 | $5,646 | Dec 31, 2024 | Final |
| Citation 1, item 1b 29 CFR 1926.850(e) · Preparatory operations |
Serious | $0 | $0 | Dec 31, 2024 | Final |
99 Main Street, Essex, MA 01929 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
202 Burlington Road, Bedford, MA 01730 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
251 Topsfield Road, Ipswich, MA 01938 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(10) · Fall protection in construction |
Serious | $3,000 | $2,300 | Jan 13, 2005 | Closed |
251 Topsfield Road, Ipswich, MA 01938 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements |
Serious | $2,500 | $1,250 | Jul 8, 2003 | Closed |
| Citation 1, item 1b 29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements |
Serious | $0 | $0 | Jul 8, 2003 | Closed |
| Citation 1, item 2 29 CFR 1926.451(f)(3) · Scaffolds, general requirements |
Serious | $2,500 | $1,250 | Jul 8, 2003 | Closed |
| Citation 1, item 3 29 CFR 1926.451(g)(1) · Scaffolds, general requirements |
Serious | $2,500 | $1,250 | Jul 8, 2003 | Closed |
| Citation 1, item 4a 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $2,500 | $1,250 | Jul 8, 2003 | Closed |
| Citation 1, item 4b 29 CFR 1926.502(b)(4) · Fall protection systems |
Serious | $0 | $0 | Jul 8, 2003 | Closed |
| Citation 1, item 5 29 CFR 1926.652(a)(1) · Trench protection |
Serious | $2,500 | $1,250 | Jul 8, 2003 | Closed |
281 Wood Road, Braintree, MA 02184 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
804 Woburn Street, Wilmington, MA 01887 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
804 Woburn Street, Wilmington, MA 01887 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.502(b)(1) · Fall protection systems |
Serious | $525 | $263 | Mar 8, 1995 | Closed |
| Citation 1, item 2 29 CFR 1926.502(b)(2) · Fall protection systems |
Serious | $2,000 | $1,000 | Mar 8, 1995 | Closed |
| Citation 1, item 3 29 CFR 1926.502(b)(4) · Fall protection systems |
Serious | $2,000 | $1,000 | Mar 8, 1995 | Closed |
Herrick Street, Beverly, MA 01915 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.404(f)(6) · Ground-fault protection on job sites |
Serious | $800 | $400 | Apr 25, 1994 | Closed |
| Citation 1, item 2 29 CFR 1926.405(g)(2)(iii) · Job-site wiring |
Serious | $800 | $400 | Apr 25, 1994 | Closed |
Herrick Street, Beverly, MA 01915 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Elm Street, Byfield, MA 01922 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.404(f)(6)
(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.
29 CFR 1926.405(g)(2)(iii)
(iii) Splices. Flexible cords shall be used only in continuous lengths without splice or tap. Hard service flexible cords No. 12 or larger may be repaired if spliced so that the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced.
29 CFR 1926.451(c)(1)(ii)
(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).
Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.