OSHA SearchOSHA records by employer

Cornerstone Builders LLC: OSHA inspections and violations

Cranston, Rhode Island · Poured Concrete Foundation and Structure Contractors · NAICS 238110

2inspections
14citation items
$32,905current penalties
Sep 22, 2025last inspection

OSHA has inspected Cornerstone Builders LLC 2 times in Rhode Island since 2020.

The latest one began on Sep 22, 2025 after a complaint, in East Greenwich; the case is still open.

Those inspections ended with 14 citation items: 10 serious and 4 other-than-serious.

Penalties were first proposed at $36,953 and now stand at $32,905, 11% lower after settlements or reviews.

Excavations comes up most often in these citations: 2 items under 1926.651.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Cornerstone Builders LLC averages $16,452 (2 cited inspections).

Cornerstone Builders LLC: OSHA citation items per year, 2020 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites Cornerstone Builders LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348517418 OPENED SEP 22, 2025Open

Complaint · Partial · Safety · 3 employees at the site · Open

23 Melrose Street, East Greenwich, RI 02818 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.25(a) · Housekeeping
Serious$2,128$2,128Jan 5, 2026Final
Citation 1, item 2
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$3,547$3,547Jan 5, 2026Final
Citation 1, item 3
29 CFR 1926.304(h)(1) · Woodworking tools
Serious$4,965$4,965Jan 5, 2026Final
Citation 1, item 4a
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$4,965$4,965Jan 5, 2026Final
Citation 1, item 4b
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Jan 5, 2026Final
Citation 1, item 5
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$4,965$4,965Jan 5, 2026Final
Citation 1, item 6
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,965$4,965Jan 5, 2026Final
Citation 1, item 7
29 CFR 1926.1052(c)(1)(i) · Stairways in construction
Serious$2,128$2,128Jan 5, 2026Final
Citation 2, item 1
29 CFR 1926.454(a) · Scaffold training
Other-than-serious$398$398Jan 5, 2026Final
Citation 2, item 2
29 CFR 1926.503(b)(1) · Fall protection training in construction
Other-than-serious$398$398Jan 5, 2026Final
Citation 3, item 1a
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$398$398May 18, 2026Final
Citation 3, item 1b
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$0$0May 18, 2026Final

Inspection 344743141 OPENED MAY 5, 2020Closed

Referral · Partial · Safety · 2 employees at the site · Closed Sep 26, 2025

612 Wilbur Ave., Cranston, RI 02920 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(j)(1) · Excavations
Serious$4,048$2,024Sep 18, 2020Final
Citation 1, item 2
29 CFR 1926.651(k)(1) · Excavations
Serious$4,048$2,024Sep 18, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.25 · Housekeeping

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

29 CFR 1926.651 · Excavations

Other poured concrete foundation and structure contractors employers in Rhode Island

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.