OSHA SearchOSHA records by employer

Coronado Stone, Inc: OSHA inspections and violations

Jeffersonville, Indiana · Brick, Stone, and Related Construction Material Merchant Wholesalers · NAICS 423320

2inspections
8citation items
$3,180current penalties
Oct 20, 2025last inspection

Since 2014, OSHA inspectors have visited Coronado Stone, Inc in Indiana 2 times.

The most recent inspection opened on Oct 20, 2025, in Jeffersonville and is still open.

In all, OSHA issued 8 citation items: 8 serious.

The proposed penalties came to $8,700; today they stand at $3,180, 63% less.

The rule cited most here is 1926.405 (job-site wiring), 2 times.

Among wholesale employers, the typical cited inspection since 2015 ends with a $3,425 penalty. Coronado Stone, Inc averages $1,200 across 1 cited inspection.

Coronado Stone, Inc: OSHA citation items per year, 2014 to 2025
Citation items per year, by inspection date.

Indiana · latest 90 days of OSHA records

78employers cited

Get notified the morning OSHA posts each new citation in Indiana: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Indiana

Checking a subcontractor, a client or your own company? Watch Coronado Stone, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348559782 OPENED OCT 20, 2025Open

Unprogrammed other · Complete · Safety · 3 employees at the site · Open

1421 East 10th Street, Jeffersonville, IN 47130 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$300$300Nov 4, 2025Open
Citation 1, item 2
29 CFR 1926.404(b)(1)(ii) · Ground-fault protection on job sites
Serious$300$300Nov 4, 2025Open
Citation 1, item 3
29 CFR 1926.405(a)(2)(ii)(i) · Job-site wiring
Serious$300$300Nov 4, 2025Open
Citation 1, item 4
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$300$300Nov 4, 2025Open

Inspection 317453751 OPENED APR 30, 2014Closed

Planned · Complete · Safety · 47 employees at the site · Closed Dec 8, 2014

4306 Charles Town Pike Road, Jeffersonville, IN 47130 · Brick, Stone, and Related Construction Material Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(d)(1) · General requirements
Serious$900$270Oct 30, 2014Closed
Citation 1, item 2
29 CFR 1910.37(b)(1) · Exit routes
Serious$1,500$338Oct 30, 2014Closed
Citation 1, item 3
29 CFR 1910.213(c)(1) · Woodworking machinery
Serious$3,000$900Oct 30, 2014Closed
Citation 1, item 4
29 CFR 1910.303(b)(1) · Electrical equipment, general requirements
Serious$2,100$472Oct 30, 2014Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.213(c)(1)

(c) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1910.22 · General requirements

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(1)

(b) Examination, installation, and use of equipment—(1) Examination. Electric equipment shall be free from recognized hazards that are likely to cause death or serious physical harm to employees. Safety of equipment shall be determined using the following considerations:

29 CFR 1910.37 · Exit routes

29 CFR 1910.37(b)(1)

(b) Lighting and marking must be adequate and appropriate. (1) Each exit route must be adequately lighted so that an employee with normal vision can see along the exit route.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.405 · Job-site wiring

Other brick, stone, and related construction material merchant wholesalers employers in Indiana

Alert subscribers get notified of each newly cited employer in Indiana the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.