OSHA SearchOSHA records by employer

Custom Drywall Systems: OSHA inspections and violations

Park City, Utah · Drywall and Insulation Contractors · NAICS 238310

1inspections
5citation items
$1,250current penalties
Sep 30, 2022last inspection

OSHA has inspected Custom Drywall Systems once in Utah.

The inspection began on Sep 30, 2022 after an accident, in Park City.

That inspection ended with 5 citation items: 4 serious and 1 other-than-serious.

Penalties were first proposed at $2,000 and now stand at $1,250, 38% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and Custom Drywall Systems averages $1,250 (1 cited inspection).

Custom Drywall Systems: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

Want to know if OSHA cites Custom Drywall Systems again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 346309107 OPENED SEP 30, 2022Closed

Accident · Partial · Safety · 5 employees at the site · Closed Mar 3, 2023

445 King Rd., Park City, UT 84068 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.416(b)(2) · Electrical safety in construction
Serious$1,500$750Nov 22, 2022Final
Citation 1, item 1b
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$0$0Nov 22, 2022Final
Citation 1, item 1c
29 CFR 1926.452(w)(1) · Rules for each type of scaffold
Serious$0$0Nov 22, 2022Final
Citation 1, item 1d
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Nov 22, 2022Final
Citation 2, item 1a
29 CFR UAC R614-1-5.B.2
Other-than-serious$500$500Nov 22, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.416(b)(2)

(2) Working spaces, walkways, and similar locations shall be kept clear of cords so as not to create a hazard to employees.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(w)(1)

(w) Mobile scaffolds. (1) Scaffolds shall be braced by cross, horizontal, or diagonal braces, or combination thereof, to prevent racking or collapse of the scaffold and to secure vertical members together laterally so as to automatically square and align the vertical members. Scaffolds shall be plumb, level, and squared. All brace connections shall be secured.

29 CFR 1926.454 · Scaffold training

Other drywall and insulation contractors employers in Utah

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.