OSHA SearchOSHA records by employer

CYM Contractors: OSHA inspections and violations

Houston, Texas · Water and Sewer Line and Related Structures Construction · NAICS 237110

3inspections
7citation items
$20,630current penalties
Jul 21, 2023last inspection

Since 2014, OSHA inspectors have visited CYM Contractors in Texas 3 times.

The most recent inspection opened on Jul 21, 2023 as a planned inspection, in Houston.

In all, OSHA issued 7 citation items: 6 serious and 1 repeat.

The proposed penalties came to $26,973; today they stand at $20,630, 24% less.

The rule cited most here is 1926.651 (excavations), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. CYM Contractors averages $6,679 across 2 cited inspections.

CYM Contractors: OSHA citation items per year, 2014 to 2023
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

393employers cited

12 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch CYM Contractors and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346866148 OPENED JUL 21, 2023Closed

Planned · Partial · Safety · 4 employees at the site · Closed Jan 29, 2024

Curtin St. At Golf St., Houston, TX 77018 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(c)(2) · Excavations
Serious$3,349$2,009Oct 12, 2023Final
Citation 1, item 2
29 CFR 1926.652(b) · Trench protection
Serious$4,688$2,813Oct 12, 2023Final

Inspection 343114575 OPENED APR 24, 2018Closed

Planned · Partial · Safety · 8 employees at the site · Closed Jan 22, 2019

Pinemont Dr. At Shepherd, Houston, TX 77018 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Repeat$8,536$8,536Aug 2, 2018Final

Inspection 339633315 OPENED MAR 12, 2014Closed

Planned · Complete · Safety · 10 employees at the site · Closed Sep 26, 2014

Attwood Ridge Conchola, Rosenberg, TX 77471 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(k)(1) · Excavations
Serious$2,800$1,952May 12, 2014Final
Citation 1, item 2
29 CFR 1926.651(c)(2) · Excavations
Serious$2,800$1,960May 12, 2014Final
Citation 1, item 3
29 CFR 1926.652(a)(1) · Trench protection
Serious$2,800$1,960May 12, 2014Final
Citation 1, item 4
29 CFR 1926.651(j)(2) · Excavations
Serious$2,000$1,400May 12, 2014Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.651(j)(2)

(2) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.

29 CFR 1926.651(k)(1)

(k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.

29 CFR 1926.652 · Trench protection

Other water and sewer line and related structures construction employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.