OSHA SearchOSHA records by employer

Daco Construction Corporation: OSHA inspections and violations

Baltimore, Maryland · Water and Sewer Line and Related Structures Construction · NAICS 237110

4inspections
5citation items
$3,712current penalties
Jun 27, 2019last inspection

Since 2018, OSHA inspectors have visited Daco Construction Corporation in Maryland 4 times.

The most recent inspection opened on Jun 27, 2019 as a planned inspection, in Baltimore.

In all, OSHA issued 5 citation items: 3 serious, 1 repeat and 1 other-than-serious.

The proposed penalties came to $6,475; today they stand at $3,712, 43% less.

The rule cited most here is 1926.652 (trench protection), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Daco Construction Corporation averages $1,856 across 2 cited inspections.

Daco Construction Corporation: OSHA citation items per year, 2018 to 2019
Citation items per year, by inspection date.

Maryland · latest 90 days of OSHA records

194employers cited

Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Maryland

Checking a subcontractor, a client or your own company? Watch Daco Construction Corporation and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344116124 OPENED JUN 27, 2019Closed

Planned · Complete · Safety · 5 employees at the site · Closed May 27, 2020

124 Berlin Avenue, Baltimore, MD 21225 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343779179 OPENED FEB 5, 2019Closed

Planned · Complete · Safety · 5 employees at the site · Closed Mar 25, 2020

2226 Kirk Avenue, Baltimore, MD 21218 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343410437 OPENED AUG 22, 2018Closed

Planned · Complete · Safety · 6 employees at the site · Closed Nov 21, 2018

Central Park Drive And Presidential Parkway East Bound Lanes, Upper Marlboro, MD 20772 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.21(b)(2) · Construction safety training
Serious$1,650$867Oct 9, 2018Final
Citation 1, item 1b
29 CFR 1926.651(k)(1) · Excavations
Serious$0$0Oct 9, 2018Final
Citation 2, item 1
29 CFR 1926.652(a)(1) · Trench protection
Repeat$3,600$1,620Oct 9, 2018Final
Citation 3, item 1
29 CFR 1926.651(c)(2) · Excavations
Other-than-serious$0$0Oct 9, 2018Final

Inspection 342930500 OPENED FEB 1, 2018Closed

Planned · Complete · Safety · 5 employees at the site · Closed May 24, 2018

1230 Baltimore Pike, Bel Air, MD 21014 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Serious$1,225$1,225Apr 24, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.21 · Construction safety training

29 CFR 1926.21(b)(2)

(2) The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.651(k)(1)

(k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.

29 CFR 1926.652 · Trench protection

Other water and sewer line and related structures construction employers in Maryland

Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.