OSHA SearchOSHA records by employer

David Cox Plastering LLC: OSHA inspections and violations

Sunrise, Florida · Painting and Wall Covering Contractors · NAICS 238320

2inspections
7citation items
$10,691current penalties
May 9, 2023last inspection

Since 2008, OSHA inspectors have visited David Cox Plastering LLC in Florida 2 times.

The most recent inspection opened on May 9, 2023 as a planned inspection, in Islamorada and is still open.

In all, OSHA issued 7 citation items: 7 serious.

The proposed penalties came to $16,718; today they stand at $10,691, 36% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. David Cox Plastering LLC averages $9,041 across 1 cited inspection.

David Cox Plastering LLC: OSHA citation items per year, 2008 to 2023
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

338employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch David Cox Plastering LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346696644 OPENED MAY 9, 2023Open

Planned · Partial · Safety · 5 employees at the site · Open

74850 Overseas Hwy, Islamorada, FL 33036 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$4,688$2,813Jun 7, 2023Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,846$1,708Jun 7, 2023Final
Citation 1, item 3
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$4,688$2,813Jun 7, 2023Final
Citation 1, item 4
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$2,846$1,708Jun 7, 2023Final

Inspection 312148992 OPENED AUG 27, 2008Closed

Planned · Complete · Safety · 5 employees at the site · Closed Jan 28, 2011

9800 Commercial Blvd., Sunrise, FL 33351 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$450$450Sep 10, 2008Closed
Citation 1, item 2
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$600$600Sep 10, 2008Closed
Citation 1, item 3
29 CFR 1926.454(a) · Scaffold training
Serious$600$600Sep 10, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.453 · Aerial lifts

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

Other painting and wall covering contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.