OSHA SearchOSHA records by employer

David Salinas: OSHA inspections and violations

Laredo, Texas · Masonry Contractors · NAICS 238140

1inspections
5citation items
$2,880current penalties
Jun 1, 2016last inspection

OSHA has inspected David Salinas once in Texas.

The inspection began on Jun 1, 2016 as a planned inspection, in Laredo.

That inspection ended with 5 citation items: 5 serious.

Penalties were first proposed at $4,800 and now stand at $2,880, 40% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and David Salinas averages $2,880 (1 cited inspection).

David Salinas: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Want to know if OSHA cites David Salinas again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 341643815 OPENED JUN 1, 2016Closed

Planned · Partial · Safety · 8 employees at the site · Closed Jan 3, 2020

9710 Mcpherson Road, Laredo, TX 78045 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,400$1,440Jul 27, 2016Final
Citation 1, item 1b
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$0$0Jul 27, 2016Final
Citation 1, item 1c
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Jul 27, 2016Final
Citation 1, item 2a
29 CFR 1926.454(a) · Scaffold training
Serious$2,400$1,440Jul 27, 2016Final
Citation 1, item 2b
29 CFR 1926.454(b) · Scaffold training
Serious$0$0Jul 27, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.454 · Scaffold training

Other masonry contractors employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.